background image

Assembly

From this stage on you will require the guardrail pack 

for platform heights up to 1.7m

1.7m platform height with added guardrails

Stage 2: Base Pack, 2m Extension 

Pack & Guardrail Pack

 

(for heights up to 3.7m)

CHECK NOW if ground is uneven fit adjustable legs.

5

 Fitting Adjustable Legs

Turn Base Unit upside 
down so wheels are facing 
upwards as shown. Use a 
19mm AF spanner to loosen 
bolt and remove fixed castor. 
Connect legs to castors. 
Insert adjustable legs into 
tubes, once complete 
reverse base frame with 
wheels being on floor. Adjust 
legs to produce a level 
structure. We recommend 
that two persons are 
required, to ease the 
erection process.

Assembly

6

 Follow the Base Unit procedure, place Horizontal 

Brace on bottom rung. Ensure structure is level before 
tower system. Use adjustable legs to level. Now fit Spring 
Interlock clips (supplied in Guardrail Pack). Assemble the 
4 spring locking clips as shown, expand spring over end 
and slide down into hole of  tube.

7

 Insert 2 m (8 rung) Lift Frame in Base Frame, ensure 

the interlock clips are engaged.

9

Fitting Interlock Clip

Locked 

Position

10

Assembly

8

 Clip on diagonal braces

as shown. Ensure that
separate frames are always
braced together. Place second
brace on opposite side as
shown. Ensure claws are locked
into position. To unlock press
trigger and lift.

9

 Attach one stabiliser to each corner of  the tower.

Loosen clamp and place around vertical tube, tighten
using handle. Refer to Stabiliser Section for positioning
diagrams. To attach one stabiliser to each corner of  
the tower loosen clamp and place around vertical tube, 
tighten using handle.

11

Содержание MiniMax

Страница 1: ...rs fitted as specified Platforms located windlocks on Handrails in place Toeboards located Refer to this checklist before using each time Check that all components are on site and that they are functi...

Страница 2: ...dismantled Safety First Wind Description Beaufort Scale Beaufort No Speed in m p h Speed in m sec Medium Breeze Raises dust and loose paper twigs snap off 4 8 12 4 6 Strong Breeze Large branches in m...

Страница 3: ...ed in total Quantity Schedule in Components Mini Max Tower to HD1004 1 83m platform Length Internal External Use Working Height m 2 8m 3 7m 5 7m 7 8m Platform Height m 0 9m 1 7m 3 7m 5 8m Description...

Страница 4: ...izontal Brace on bottom rung Ensure structure is level before tower system Use adjustable legs to level Now fit Spring Interlock clips supplied in Guardrail Pack Assemble the 4 spring locking clips as...

Страница 5: ...ern should follow a simple zig zag shape see insert 12 Ensure Intermediate Guardrails are positioned onto the upright above the horizontal tube with the claws locked outwards as shown Then move the pl...

Страница 6: ...ling ensuring that no Diagonal Braces or Stabilisers are prematurely released 1 Remove Toeboards and upper Guardrails 2 Go down to lower platform remove upper platform 3 Move lower platform and Guardr...

Страница 7: ...ck clip When moving tower lock each telescopic leg just clear of the ground unlock castors ensuring area is firm and clear of all obstructions both on the ground and above After moving check all casto...

Отзывы: