Youngman MiniMax Скачать руководство пользователя страница 1

MiniMax 

Mobile Aluminium Tower

USER GUIDE

Introduction

Safe Use

This Assembly Guide is designed to provide you with step 
bystep instructions to ensure that your system is erected 
with themaximum of  ease and safety. Before assembly, 
please read thesafety notes. Operatives must be qualified 
or competent toerect the tower. If  the scaffold is passed 
on to another personthey should also receive these 
instructions. Consult the PASMA Guide for full information 
on the use of  Mobile Towers.

Checklist

Inspect components prior to erection

Inspect tower prior to use

Tower upright

Castors locked and legs correctly adjusted

Braces & platform level

Stabilisers fitted as specified

Platforms located & windlocks on

Handrails in place

Toeboards located

Refer to this checklist before using each time.

 Check that all components are on site and that they are

functioning correctly – (refer to check list and quantities).

 Check that the ground is level and capable of  

supporting the weight of  the strucure.

 During erection it is recommended that a temporary

guardrail brace be employed.

 The safe working load is 220 kgs per platform uniformly

distributed, 500kg per tower structure.

This must not be exceeded.

 The tower should always be climbed from the inside.

 Do not use boxes or step ladders on the platform to 

gain additional height.

Lifting of Equipment

 Components should be firmly secured by a reliable 

lifting material (eg rope), employing a reliable knot to 
ensure safe fastening and always lift within the tower.

1

2

Содержание MiniMax

Страница 1: ...rs fitted as specified Platforms located windlocks on Handrails in place Toeboards located Refer to this checklist before using each time Check that all components are on site and that they are functi...

Страница 2: ...dismantled Safety First Wind Description Beaufort Scale Beaufort No Speed in m p h Speed in m sec Medium Breeze Raises dust and loose paper twigs snap off 4 8 12 4 6 Strong Breeze Large branches in m...

Страница 3: ...ed in total Quantity Schedule in Components Mini Max Tower to HD1004 1 83m platform Length Internal External Use Working Height m 2 8m 3 7m 5 7m 7 8m Platform Height m 0 9m 1 7m 3 7m 5 8m Description...

Страница 4: ...izontal Brace on bottom rung Ensure structure is level before tower system Use adjustable legs to level Now fit Spring Interlock clips supplied in Guardrail Pack Assemble the 4 spring locking clips as...

Страница 5: ...ern should follow a simple zig zag shape see insert 12 Ensure Intermediate Guardrails are positioned onto the upright above the horizontal tube with the claws locked outwards as shown Then move the pl...

Страница 6: ...ling ensuring that no Diagonal Braces or Stabilisers are prematurely released 1 Remove Toeboards and upper Guardrails 2 Go down to lower platform remove upper platform 3 Move lower platform and Guardr...

Страница 7: ...ck clip When moving tower lock each telescopic leg just clear of the ground unlock castors ensuring area is firm and clear of all obstructions both on the ground and above After moving check all casto...

Отзывы: