background image

Handrails and Toe Boards

Follow the requirements contained in the work at height regulations 

when choosing and fitting handrails and toe boards.

Fitting 

Raise the outside and inner clamps on the handrail post to 

allow the staging board to be fitted. 
 Fit the staging resting on the bottom bar of the handrail post.

 Fit the outside clamp first, positioning the clamp hard against 

the staging stile and secure. 
Fit the inner clamp against the opposite stile and secure. 

 Fit handrail tubes through U bolts of upright post and secure.

 Position toe board against the inside of the handrail post and 

lower toe board clip to secure into place.

1

2
3

4
5
6

The inner clamp on the handrail post allows two staging boards to 

be placed side by side. Ensure all nuts and bolts are tight before 

using the staging board. 

Handrail Tube  

5

U Bolt  

5

Handrail Post  

2

Toe Board Clip  

6

Toe Board  

6

Outside Clamp  

1

 

3

Staging  

2

 

Inner Clamp  

1

 

4

Отзывы: