background image

 

 

 

Содержание HARBOR

Страница 1: ...ty of Industry CA 91748 Country of Original China Code Yotrio 2012 Caution This Gazebo is made for the explicit purpose of providing outdoor furniture and is not to be used as a toy This product is no...

Страница 2: ...or wind We reserve the right to make substitutions with similar merchandise if the model in questions is no longer in production The manufacturer recommends that with ANY formidable weather approachi...

Страница 3: ...NDARD TIME 11 30 AM TO 8 00PM EASTERN STANDARD TIME YOTRIO CUSTOMER CARE Warranty Coverage Requirements 1 Copy of your Original Store Receipt 2 Pictures of the damaged parts 3 You must know the name o...

Страница 4: ...No QTY Description Name A 4pcs Pillar A B 4pcs Pillar B C 4pcs Pillar C D 8pcs Panel E 4pcs Beam E F 4pcs Top Tube F G 4pcs Top Tube G H 4pcs Top Tube H I 4pcs Top Tube I J 1pc Canopy Hub J K 1pc Can...

Страница 5: ...am M N 1pc Canopy Fabric O O 1pc Canopy Fabric P P 2pcs Sidewall Q 4pcs Netting R 40pcs Plastic Ring S 8pcs Decorative Ball T 32pcs M6x25mm Bolt U 40pcs M6x15mm Bolt V 4pcs M6x28mm Bolt Nut W 4pcs Gro...

Страница 6: ...illar A B and C with corresponding bolt holes on the Panels D Screw the Bolts T on Screw the Bolts U on the Foot Edge L together with Pillar A B and C See Fig 1 Note Make sure the direction of Pillar...

Страница 7: ...the round tube of the beams is in the inside STEP 4 Insert the Top Tubes F into the Top Tubes G Then insert the Top Tube G and Top Tube H into the Canopy Hub K Screw the Top Tubes F together with the...

Страница 8: ...STEP 5 Place the Canopy Fabric O on the roof See Fig 5 STEP 6 Insert the Top Tube I into the Canopy Hub J and insert the Top Tube I into the Top Tube G See fig 6...

Страница 9: ...Canopy Fabric O in place Put up the two Side Walls P on the Beams E Note The Harbor Gazebo package includes two privacy side walls This is designed to be used for half of the gazebo See Fig 7 STEP 8 P...

Страница 10: ...on the bottom of Panel D first and then twist the Corkscrew Ground Spike Z1 down into the ground until Panels D are secure see Fig 9 Once the Corkscrew Ground Spikes are secured Pound the Ground Spike...

Страница 11: ...INSTRUCCIONESDEENSAMBLAJE DE La Carpa Harbor...

Страница 12: ......

Страница 13: ...E 11 30 A M A 8 00 P M HORA EST NDAR DEL ESTE SERVICIO AL CLIENTE DE YOTRIO Requisitos para la cobertura de la garant a 1 Copia del recibo original de compra 2 Im genes de la pieza da ada 3 Debes cono...

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ...9 9...

Отзывы: