■EPDT-201g■

 

Water receiving tank and high placement water tank application

 

Emergency shut-off system 

 

Type MD-71  Emergency shut-off valve 

Type KS-5    Emergency shut-off valve control panel 

 

Operation manual 

Thank you very much for purchasing this product from Yoshitake. To use the purchased product on a 
correct and safe basis, read this text before using it.    In addition, the user customer is to store this 
document carefully. 

 

Responsibility for a failure of the product caused by improper handling will be assumed by the customer.   
In this case, the product will be replaced or repaired at the customer's expense. 

 

----- Symbols used in this text refer to the following: -----

 

 

Warning

 

Improper handling may cause the user to be killed or seriously injured

 

 

 

Caution

 

Improper handling may cause the user to be slightly injured or the 
equipment to be damaged

 

 

Table of contents 

1. Product application   ···················································································· 1 

2. Specifications 

2.1 Specifications for the emergency shut-off valve   ···································· 1 

2.2 Specifications for the emergency shut-off valve control panel   ··············· 2 

3. Nominal diameter selection ·········································································· 3 

4. Dimensions, weight, and structure 

4.1 Emergency shut-off valve  ······································································ 4 

4.2 Emergency shut-off valve control panel   ················································ 5 

5. Operational description 

5.1 Normal condition ····················································································· 5 

5.2 In the case of an earthquake ··································································· 6 

5.3 Recovery work ························································································ 6 

6. Process flowchart ························································································ 6 

7. Installation procedure 

7.1 Sample piping diagram ··········································································· 7 

7.2 Shut-off valve and control panel connection diagram ······················· 8 to 9 

7.3 Warnings and cautions in installing the product ··························· 10 to 12 

7.4 How to adjust the seismic detector ·············································· 12 to 13 

8. Operation procedure 

8.1 Warnings in operation ·········································································   14 

8.2 Trial running ···············································································   14 to 17 

9. Maintenance procedure 

9.1 Malfunctions and troubleshooting ················································ 18 to 19 

9.2 Warnings and cautions in maintenance and inspection ························ 19 

9.3 Periodic inspection ·····································································    19  to 21 

9.4 Manual operation method ··························································   21 to 22 

About after-sales service

 

 
 

Содержание MD-71

Страница 1: ...uipment to be damaged Table of contents 1 Product application 1 2 Specifications 2 1 Specifications for the emergency shut off valve 1 2 2 Specifications for the emergency shut off valve control panel...

Страница 2: ...Geometry Wafer shape Type JIS 10 K Applicable fluid Tap water Maximum usable pressure 1 0MPa Fluid temperature 5 60 Installation posture Installed from square to lateral direction to a horizontal pip...

Страница 3: ...t point a 1a ON contact point in the case of a power supply drop fault in the control panel Shut off valve opening switch Shut off valve opening switch Seismic detector Detection direction All horizon...

Страница 4: ...iping nominal diameter selection method Standard flow rate of the fluid Fluid Standard flow rate Water or oil 2 m s 2 4 This table shows the standard flow rate created with reference to the specificat...

Страница 5: ...d L D H JIS 10K Wafer shape Weight kg C n h 50A 52 41 102 332 120 4 19 7 7 65A 64 44 135 349 140 4 19 9 2 80A 78 44 145 356 150 8 19 9 7 100A 103 51 175 384 175 8 19 12 125A 129 54 206 406 210 8 23 15...

Страница 6: ...n this comes on 9 Battery switch When the switch is turned on the storage battery starts charging Turn this on in general 10 In backup lamp When the battery switch is turned on this comes on 11 Storag...

Страница 7: ...the shut off valve closing lamp come on 5 3 Recovery work If the shut off valve closes the valve in the case of an earthquake make sure that no fault of the piping is found and then press the shut off...

Страница 8: ...or high placement water Shut off valve No 1 25m or less 1 25mm2 x 5 cores 50m or less 2 00mm2 x 5 cores Shut off valve No 2 25m or less 1 25mm2 x 5 cores 50m or less 2 00mm2 x 5 cores Control panel t...

Страница 9: ...o voltage contact point c Seismic detector external alarm intent No voltage contact point a Power supply external alarm intent No voltage contact point a Inside the control panel without the front doo...

Страница 10: ...ff valve 2 Seismic detector external alarm intent It is an output terminal when the seismic detector works No voltage contact point a The point of contact shuts after the seismic sensor works Cautions...

Страница 11: ...ol panel and the electric operator interior are free from water intrusion An electric shock can possibly be given 9 Avoid access to the terminal portion and connected portion out of the connection wor...

Страница 12: ...ssibly cause a malfunction 2 When installing the control panel reserve sufficient space for maintenance inspection and repair 3 Avoid installing the control panel in a floodable place 4 Install the co...

Страница 13: ...or dust from intruding into the electric actuator 2 Accurately center align the connection flange and the shut off valve to prevent the valve body from coming in contact with the inside of the pipe 3...

Страница 14: ...t intent nut so that the level protractor bead chain will not come in contact with the reference hole and temporarily retain the level protractor adjustment intent lock nut Next move the adjustment pl...

Страница 15: ...retention intent stopper is not removed the seismic detector does not operate When the shut off valve closing switch see page 5 is pressed without removing the steel ball retention intent stopper the...

Страница 16: ...making a trial ensure to check the following items 1 Make sure that no mistake of the connection and input power supply specifications is found 2 Make sure that the steel ball retention intent stoppe...

Страница 17: ...itch to the automatic side Make sure that the device operate if connected with the external alarm intent terminal Make a check for connection and broken wires Make sure that the device operate if conn...

Страница 18: ...4 Operation check with the seismic detector Interlo ck with the pump requires the pump in a running condition a Condition check a Make sure that the shut off valve automatic close selector switch is...

Страница 19: ...cting the operation procedure from a to b inspect the check contents a Turn on the breaker b Turn on the battery switch Make sure that the input power supply is energized at all times Check the input...

Страница 20: ...is pressed the shut off valve does not opens the valve Factors of the control panel 1 The input power supply breaker and battery switch are not turned on 2 The connection of the control panel and shu...

Страница 21: ...cool down the product main body to a bare handed accessible temperature to conduct it The residual pressure in the product or piping can possibly injure or burn the operator 2 If the product is used...

Страница 22: ...se the lever upward and set the steel ball on the receiving rod Use the set value indication plate to make sure that the set acceleration range is fulfilled If the set acceleration range is not met re...

Страница 23: ...then attach the retention fittings and the battery connectors 4 Turn on the breaker and the battery switch and charge the battery for approximately 30 minutes 5 According to the procedure of 8 2 Trial...

Страница 24: ...on and then start this procedure The product can possibly be broken Lower the manual clutch knob below the electric operation machine and turn it by 90 degrees clockwise or counterclockwise The connec...

Страница 25: ......

Отзывы: