Remove the main body cover 

 of the seismic 

detector close to you and, as shown in this figure, 

use a cotton swab (not possibly scratching the steel 

ball 

)  or an equivalent to softly press the steel 

ball 

 to release it from the receiving rod 

.  

(See "7.4 How to adjust the seismic detector" on 

page 12). 

Allow the seismic detector to activate by dropping 
the steelball

  from the receiving rod 

 

 
 
 

9.4.2 Shut-off valve

 

 

    

Warning

 

(1)Make sure that the power supply is not turned on and then start this procedure. 

*An electric shock can possibly be given.

 

 

 

Cautions

 

(1)Keep watching an opening indicator or an equivalent to conduct a manual operation and check 

the wide open and fully closed positions to prevent them from being exceeded. 

*If they are exceeded, the product will be damaged. 

(2)Make sure that the power supply is not turned on and then start this procedure. 

*The product can possibly be broken.

 

 

Lower the manual clutch knob below the 

electric operation machine and turn it by 90 

degrees clockwise or counterclockwise. 

(The connection to the motor comes off to 

allow a manual operation). 

Engage a monkey wrench or an equivalent 

with the hexagon of the connector portion 

(two facets of the manual operation shaft for 

200A) to conduct a switching operation. 

 To return to an automatic operation, return 

the manual clutch knob to the original 

condition.  In this case, make sure that the 

manual clutch knob has returned to the 

original condition. 

If it does not return to the original condition, 
slightly move the connector or the manual 
operation shaft.   
Before proceeding to an automatic operation, 
ensure to remove the monkey wrench and 
the manual handle.

 

Cotton swab or an equivalent 
  (not possibly scratching the steel ball)

50

150A 

200A 

Opening indicator 

(O: Fully open, S: Fully closed)

Manual clutch   
knob 

Connector 

Manual operation 
shaft

Manual clutch 
knob

Содержание MD-71

Страница 1: ...uipment to be damaged Table of contents 1 Product application 1 2 Specifications 2 1 Specifications for the emergency shut off valve 1 2 2 Specifications for the emergency shut off valve control panel...

Страница 2: ...Geometry Wafer shape Type JIS 10 K Applicable fluid Tap water Maximum usable pressure 1 0MPa Fluid temperature 5 60 Installation posture Installed from square to lateral direction to a horizontal pip...

Страница 3: ...t point a 1a ON contact point in the case of a power supply drop fault in the control panel Shut off valve opening switch Shut off valve opening switch Seismic detector Detection direction All horizon...

Страница 4: ...iping nominal diameter selection method Standard flow rate of the fluid Fluid Standard flow rate Water or oil 2 m s 2 4 This table shows the standard flow rate created with reference to the specificat...

Страница 5: ...d L D H JIS 10K Wafer shape Weight kg C n h 50A 52 41 102 332 120 4 19 7 7 65A 64 44 135 349 140 4 19 9 2 80A 78 44 145 356 150 8 19 9 7 100A 103 51 175 384 175 8 19 12 125A 129 54 206 406 210 8 23 15...

Страница 6: ...n this comes on 9 Battery switch When the switch is turned on the storage battery starts charging Turn this on in general 10 In backup lamp When the battery switch is turned on this comes on 11 Storag...

Страница 7: ...the shut off valve closing lamp come on 5 3 Recovery work If the shut off valve closes the valve in the case of an earthquake make sure that no fault of the piping is found and then press the shut off...

Страница 8: ...or high placement water Shut off valve No 1 25m or less 1 25mm2 x 5 cores 50m or less 2 00mm2 x 5 cores Shut off valve No 2 25m or less 1 25mm2 x 5 cores 50m or less 2 00mm2 x 5 cores Control panel t...

Страница 9: ...o voltage contact point c Seismic detector external alarm intent No voltage contact point a Power supply external alarm intent No voltage contact point a Inside the control panel without the front doo...

Страница 10: ...ff valve 2 Seismic detector external alarm intent It is an output terminal when the seismic detector works No voltage contact point a The point of contact shuts after the seismic sensor works Cautions...

Страница 11: ...ol panel and the electric operator interior are free from water intrusion An electric shock can possibly be given 9 Avoid access to the terminal portion and connected portion out of the connection wor...

Страница 12: ...ssibly cause a malfunction 2 When installing the control panel reserve sufficient space for maintenance inspection and repair 3 Avoid installing the control panel in a floodable place 4 Install the co...

Страница 13: ...or dust from intruding into the electric actuator 2 Accurately center align the connection flange and the shut off valve to prevent the valve body from coming in contact with the inside of the pipe 3...

Страница 14: ...t intent nut so that the level protractor bead chain will not come in contact with the reference hole and temporarily retain the level protractor adjustment intent lock nut Next move the adjustment pl...

Страница 15: ...retention intent stopper is not removed the seismic detector does not operate When the shut off valve closing switch see page 5 is pressed without removing the steel ball retention intent stopper the...

Страница 16: ...making a trial ensure to check the following items 1 Make sure that no mistake of the connection and input power supply specifications is found 2 Make sure that the steel ball retention intent stoppe...

Страница 17: ...itch to the automatic side Make sure that the device operate if connected with the external alarm intent terminal Make a check for connection and broken wires Make sure that the device operate if conn...

Страница 18: ...4 Operation check with the seismic detector Interlo ck with the pump requires the pump in a running condition a Condition check a Make sure that the shut off valve automatic close selector switch is...

Страница 19: ...cting the operation procedure from a to b inspect the check contents a Turn on the breaker b Turn on the battery switch Make sure that the input power supply is energized at all times Check the input...

Страница 20: ...is pressed the shut off valve does not opens the valve Factors of the control panel 1 The input power supply breaker and battery switch are not turned on 2 The connection of the control panel and shu...

Страница 21: ...cool down the product main body to a bare handed accessible temperature to conduct it The residual pressure in the product or piping can possibly injure or burn the operator 2 If the product is used...

Страница 22: ...se the lever upward and set the steel ball on the receiving rod Use the set value indication plate to make sure that the set acceleration range is fulfilled If the set acceleration range is not met re...

Страница 23: ...then attach the retention fittings and the battery connectors 4 Turn on the breaker and the battery switch and charge the battery for approximately 30 minutes 5 According to the procedure of 8 2 Trial...

Страница 24: ...on and then start this procedure The product can possibly be broken Lower the manual clutch knob below the electric operation machine and turn it by 90 degrees clockwise or counterclockwise The connec...

Страница 25: ......

Отзывы: