![York YMAA 0045 Скачать руководство пользователя страница 72](http://html1.mh-extra.com/html/york/ymaa-0045/ymaa-0045_installation-manual_4255008072.webp)
FORM NO.:6U6K-B01E-NB-EN
JOHNSON CONTROLS
72
YMAA/YMPA0160-0200 (WITH HYDRO KIT)
Note
:
All dimensions are in mm unless specified otherwise.
Note
:
Placement on a level surface of free of obstructions (including
snow, for winter operation) or air circulation ensures rated
performance, reliable operation, and ease of maintenance.
Site restrictions may compromise minimum clearances
indicated below, resulting in unpredictable airflow patterns
and possible diminished performance. YORK’s unit controls
will optimize operation without nuisance high-pressure safety
cutouts; however, the system designer must consider potential
performance degradation. Recommended minimum clearances:
front to wall – 2m; rear to wall – 2m; control panel end to wall
– 2m; cooler end to wall – 2m; top – no obstructions allowed;
distance between adjacent units – 400mm or 700mm, refer to
Piping System Connections. No more than one adjacent wall
may be higher than the unit. 1" nominal deflection isolators (not
shown) will increase overall unit height by 150mm.
FIGURE 38 –
YMAA/YMPA0160-200 DIMENSIONS
Cooke Industries - Phone: +64 9 579 2185 Email: [email protected] Web: www.cookeindustries.co.nz