Maintenance and
Disassembly
Page 25
1.3.1 Indoor Unit
Collecting the refrigerant into the outdoor unit
/TJUUX[TOZ
2OW[OJYOJK
-GYYOJK
)RUYK
)RUYK
:]U]G_\GR\K
:NXKK]G_\GR\K
5[ZJUUX[TOZ
5VKT
)RUYK
2U
.O
Procedure:
1.
Confirm that the 2- and 3-way valves are opened.
2.
Connect the charge hose with the push pin of Handle
Lo to the 3-way valve’s gas service port.
3.
Open the Handle Lo manifold valve to purge air
from the charge hose for 5 seconds and then close it
quickly.
4.
Close the 2-way valve.
5.
Operate the air conditioner in cooling mode. Cease
operations when the gauge reaches 0.1 MPa
(14.5 Psi).
6.
Close the 3-way valve so that the gauge rests
between 0.3 MPa (43.5 Psi) and 0.5 MPa (72.5 Psi).
7.
Disconnect the charge set and mount the caps of
service port and 2- and 3-way valves.
8.
Use a torque wrench to tighten the caps to a torque
of 18N.m.
9.
Check for gas leakage.
Air purging with vacuum pump
Содержание YEFE BZSM-MOW1 Series
Страница 2: ......
Страница 4: ......
Страница 15: ...Specifications Page 11 YUFE18BYTM MO X YUFE24BYTM MO X Y G POWER SUPPLY 24V L N C 1 N 1 TO INDOOR UNIT ...
Страница 18: ...Specifications Page 14 YUFE60BYTM MS 1 R S C YUFE60BYSM MS 1 R ...
Страница 24: ...Product Features Page 20 ...
Страница 106: ...Contents i Temperature Sensor Resistance Value Table for T1 T2 T3 and T4 C K 112 i Pressure On Service Port 113 ...