YCM03H1
4 4
2
1
YCM04H1
8 4
2
1
YCM05H1
8 4
2
1
YCM06H1
8 4
2
1
YCM07H1
12 4
2
1
YCM08H1
12 4
2
1
YCM10H1
12 4
2
1
YCM12H1
12 4
2
1
YCM15H1
24 12
6
1
YCM18H1
24 12
6
1
YCM20H1
36 12
6
1
YCM22H1
36 12
6
1
YCM25H1
36 12
6
1
YCM28H1
36 12
6
1
YCM30H1
36 12
6
1
YCM33H1
48 16
8
1
YCM36H1
48 16
8
1
YCM40H1
72 24
12
1
YCM45H1
72 24
12
1
YCM50H1
72 24
12
1
YCM60H1
72 24
12
1
Matters Needing Attention in Installation:
Notice: Sterilizer will be damaged if the voltage beyond the running range of sterilizer. When you install it, all
switches connected with sterilizer should be in position off.
Manipulation:
The power supply of ultra-violet lamp of sterilizer is single-phase power. The voltage is AC 220V (50Hz/60Hz). Don t
stare at ultra-violet lamp of sterilizer for a long time. The sterilizer can be linkage-controlled with relevant unit (the
relevant wiring of linkage control is set by user). When internal fan is running, sterilizer will be running. Vice versa.
Matters Needing Attention:
The components of sterilizer have been installed in factory except the lamps need to be installed by the user . They are
tested and examined strictly before ex-factory. The components are packaged in good order. So under normal condition,
sterilizer should be well when it is sent to destination. When you receive sterilizer, you should check all parts. If any
obvious damage occurs, you should write it on the document of carriage of carrier. Then make claim against it according
to the indication of notice letter. If other parts and components are damaged except the surface, please inform
serviceman in local YORK CORPORATION immediately.
YORK CORPORATION will not be responsible for the losses and damages caused in the course of transportation or
after arrival consignee. Please hold this installation and operation manual properly so that you can read it again at any
moment, or give it to operators for reference.
2-12 Dry Steam Humidifier Installation
27
Installation &
Transportation