Horizontal Left Air Flow (Inducer Low) -
Refer to Figures 31 & 32

1.

Remove all the condensate hoses inside the furnace, leaving the
3/8" barbed nipple and hose # 4, both factory installed, in the rain
gutter.

2.

Remove the condensate trap and its bracket from inside the fur-
nace, saving the screws for use later.

3.

Remove the yellow cap from the top drain of the rain gutter and
install loosely packed 3/8" barbed nipple in it.

4.

Remove the large condensate cap from the side of the condensate
pan and install it on the middle drain of the condensate pan, from
where #1 hose was removed.

5.

Install longer dogleg end of hose #10 through the casing hole on to
the side drain of the condensate pan, where cap was removed in
step #4. Some lubricant may have to be used to facilitate this
installation as the hose is designed as a tight fit over the conden-
sate drain. The other, shorter, dogleg end of hose #10 should be
installed into the large recessed drain in the condensate trap.

6.

Install the condensate trap bracket, with the condensate trap, on to
the front side of the furnace, using the screws removed in step #1.

7.

Switch the blocked condensate hose to the condensate tap on the
bottom of the condensate pan (close to the inducer).

8.

Install hose #9 between the external drain on the Wye and the
condensate trap; with the dogleg end installed on the protruded
(stub) drain of the condensate trap. The length of hose #9 may
have to be trimmed to ensure proper condensate drainage.

9.

Remove all condensate hoses off the 3/8" barbed tee.

10. Cut 1-1/2" length of straight 3/8" hose off of hose #5 and install it

on the 3/8" barbed tee. The other end of the 1-1/2" hose should be
installed on the welled opening on the condensate trap. 

11.

Install one end of the 3/8" barbed tee on hose #4 as shown.
Ensure that hose #4 follows a gradual downward slope all the way
to the barbed tee. 

12. Install hose #6 between the top drain of the rain gutter of the

inducer and the remaining open end of 3/8" barbed tee. 

13. Ensure that all hoses are properly installed, have no kinks, and are

draining properly. All hoses on the condensate trap should be
pushed all the way down to ensure against leakage.

 FIGURE 30:  

Downflow Condensate Drain Hose Configuration

HOSE #9

3/4”

1-5/8”

33”

3/4”

HOSE #2

3/8”

17-1/2”

SPRING CLAMP

3/4”

DOG

LEG

HOSE #8

1”

22-1/8”

SPRING CLAMP

2-3/4”

1”

DOG
LEG

* USED AFTER
CONDENSATE
TRAP

HOSE #4

2”

3/4”

1/2”

SPRING CLAMP

HOSE #2

(if drain aligned

above the hole in
furnace top)

HOSE #4

(with 3/8”

barbed nipple)

HOSE #5

HOSE #1

HOSE #3

3/8” Barbed Tee

HOSE #5

SPRING CLAMP

9”

3/4”

3/4”

SPRING CLAMP

HOSE #3

3-3/8”

5/8”

1-1/8”

1”

2-3/4”

8-1/8”

HOSE #1

DOGLEG

SPRING CLAMP

-

CUT
4-1/2”
PIECE

Содержание PS9 DH Series

Страница 1: ...Gas Valve 9 Downflow Gas Piping 9 Horizontal Gas Piping 9 Electrical Wiring 11 Thermostat Chart 12 Accessory Connections 13 Typical Twinned Furnace Application 13 Single Stage Twinning Wiring Diagram...

Страница 2: ...ible materials as listed under Clearances to Combustibles in Table 1 Provide clearances for servicing ensuring that service access is allowed for both the burners and blower These models ARE NOT CSA l...

Страница 3: ...other storage purposes as a fire hazard may be created Never store items such as the following on near or in contact with the fur nace 1 Spray or aerosol cans rags brooms dust mops vacuum cleaners or...

Страница 4: ...the cabinet to the duct connec tor Refer to the installation instructions for additional information When replacing an existing furnace if the existing plenum is not the same size as the new furnace...

Страница 5: ...nges or tabs that are securely attach and sealed to the supply air duct and to the base of the furnace The transi tion duct must have insulation between the transition duct and any com bustible materi...

Страница 6: ...et specifically intended for horizontal applications If a matching cooling coil is used it may be placed directly on the supply air side of the furnace and sealed to prevent leakage A warm air duct pl...

Страница 7: ...e of a filter Replacement filter size is shown in Table 5 NOTES 1 Air velocity through throwaway type filters may not exceed 300 feet per minute All velocities over this require the use of high veloci...

Страница 8: ...ce plenum Any branch duct rectan gular or round duct attached to the plenum must attach to the vertical plenum above the filter height The use of straps and or supports is required to support the weig...

Страница 9: ...at the factory for natural gas fired operation at 0 8 000 feet 0 m 2 438 m above sea level The manifold pressure must be changed in order to manitain proper and safe operation when the furnace is ins...

Страница 10: ...extremely dangerous condition resulting in premature heat exchanger failure excessive sooting high levels of carbon monoxide personal injury property damage a fire hazard and or death High altitude a...

Страница 11: ...versed the control board will flash 9 times The furnace will not operate until the polarity is corrected Refer to Furnace Diag nostics section of the User s Information Maintenance Ser vice Manual pro...

Страница 12: ...w Batteries BN11C01124 DP11C40124 PSC 2 STAGE COOLING READY FURNACE CONTROL SINGLE STAGE AIR CONDITIONING BN11C00124 BP11C50124 PP11C70224 THERMOSTAT THERMOSTAT THERMOSTAT HP2 Single Stage H P E RD E...

Страница 13: ...furnace operates on W2 then the use of an air mixing device in the plenum to mix the air from both fur naces is strongly recommended The mixing device must be installed before any ducts that supply a...

Страница 14: ...as shown in the Figure 15 1 Connect the low voltage wiring from the wall thermostat to the ter minal strip on the control board of Furnace 1 For staging applica tions the wire from thermostat W1 is co...

Страница 15: ...for Type BH Gas Venting Systems IPEX System 636 PVC is certified to this standard 8 In Canada the first three feet 900 mm of the vent must be readily accessible for inspection Example An 80 000 BTUH f...

Страница 16: ...proper fit support and slope on the following systems A Sealed combustion air systems from the furnace to the out side termination B Ventilated combustion air systems from the furnace to the attic or...

Страница 17: ...ons 9 inches 23 cm for models 50 000 BTUH 15 kW 12 inches 30 cm for models 50 000 BTUH 15 kW C Clearance to permanently closed window 12 inches 30 cm 12 inches 30 cm D Vertical clearance to ventilated...

Страница 18: ...VC street elbow as shown in Figure 18 3 Locate the rubber condensate hose in front of the blower access panel 4 Slide the hose through the hole in the top cover and insert the hose on to the barbed fi...

Страница 19: ...gh a PVC or ABS pipe that is connected to the PVC coupling attached to the burner box and is terminated in the same atmospheric zone as the vent This type of installation is approved on all models Ref...

Страница 20: ...uvers and grilles varies widely the installer should follow lou ver or grilles manufacturer s instructions Dampers Louvers and Grilles Canada Only 1 The free area of a supply air opening shall be calc...

Страница 21: ...bow usage Follow all notes procedures and required materials in the SEALED COMBUSTION AIR SUPPLY section in these instructions when installing the combustion air pipe from the unit and into a venti la...

Страница 22: ...of heat tape Wrap the drain trap and the drain line with the heat tape and secure with ties Follow the heat tape manufacturer s recommendations CONDENSATE DRAIN HOSE PART NUMBERS DOWNFLOW HORIZONTAL C...

Страница 23: ...e pan close to the inducer 8 Install hose 9 between the external drain on the Wye and the condensate trap with the dogleg end installed on the protruded stub drain of the condensate trap The length of...

Страница 24: ...IS TUBE FOR THE BLOCKED CONDENSATE SWITCH MUST BE RELOCATED FROM ITS ORIGINAL FACTORY INSTALLED LOCATION BEHIND THE COMBUSTION AIR PIPE TO THE TAP BEHIND THE DRAFT INDUCER A SMALL HOSE IS INSTALLED ON...

Страница 25: ...BARBED TEE 3 8 BARBED NIPPLES 1 1 2 PIECE OF 3 8 HOSE HOSE 10 3 4 2 1 2 HOSE 4 SPRING CLAMP 1 SPRING CLAMP 1 2 3 4 22 1 8 HOSE 8 DOG LEG USED AFTER CONDENSATE TRAP HOSE 9 3 4 33 3 4 1 5 8 HOSE 6 1 5...

Страница 26: ...kout opening in this configuration using the provided condensate trap bracket Some modifications may however have to be made to the condensate hoses Installation with condensate trap bracket Back of c...

Страница 27: ...ts Group 27 FIGURE 33 Horizontal Right Condensate Drain Hose Configuration Option 1 Front of Casing HOSE 2 HOSE 7 THIS TUBE FOR THE BLOCKED CONDENSATE SWITCH HAS BEEN FACTORY INSTALLED FOR THIS POSITI...

Страница 28: ...SE 4 SPRING CLAMP 3 4 3 4 HOSE 7 21 SPRING CLAMP 3 4 17 1 2 3 8 HOSE 2 DOG LEG 1 SPRING CLAMP 1 2 3 4 22 1 8 HOSE 8 DOG LEG USED AFTER CONDENSATE TRAP 1 2 3 4 8 1 8 HOSE 1 DOGLEG SPRING CLAMP CUT 4 1...

Страница 29: ...Condensate Drain Hose Configuration Option 2 Back of Casing HOSE 2 CUT FROM HOSE 1 2 1 2 long HOSE 7 THIS TUBE FOR THE BLOCKED CONDENSATE SWITCH HAS BEEN FACTORY INSTALLED FOR THIS POSITION HOSE 9 HO...

Страница 30: ...SE 4 SPRING CLAMP 3 4 3 4 HOSE 7 21 SPRING CLAMP 3 4 17 1 2 3 8 HOSE 2 DOG LEG 1 SPRING CLAMP 1 2 3 4 22 1 8 HOSE 8 DOG LEG USED AFTER CONDENSATE TRAP 1 2 3 4 8 1 8 HOSE 1 DOGLEG SPRING CLAMP CUT 4 1...

Страница 31: ...nt piping or terminal 3 Failure of combustion air blower motor 4 Blockage of condensate drain piping LIMIT CONTROLS There is high temperature limit control located on the furnace vestibule panel near...

Страница 32: ...ing out With furnace in operation check all of the pipe joints gas valve connec tions and manual valve connections for leakage using an approved gas detector a non corrosive leak detection fluid or ot...

Страница 33: ...at the gas meter times a barometric pressure and temperature correction factor of 0 960 times 3600 then divided by the time it took to measure 0 10 m3 of gas from the gas meter For Propane LP Gas mul...

Страница 34: ...erence atmo spheric pressure Refer to Figure 39 for connection details IMPORTANT The cap for the pressure regulator must be removed entirely to gain access to the adjustment screw Loosening or tighten...

Страница 35: ...ser selection of the blower speed that is energized during continuous fan operation Place jumper on the HI COOL LO COOL or HEAT pins The blower speed connections shown in Figure 40 are typical How eve...

Страница 36: ...out Low gas pressure faulty gas valve faulty hot surface ignitor or burner problem may cause this The furnace will lock out for one hour and then restart 8 RED FLASHES This fault is indicated if the...

Страница 37: ...26 25 24 22 21 19 Low 775 777 757 733 698 663 627 584 549 490 22 22 21 21 20 19 18 17 16 14 80 1600 C High 2071 2026 1981 1935 1864 1796 1713 1625 1532 1401 59 57 56 55 53 51 48 46 43 40 Med High 1583...

Страница 38: ...50 from the airflow 0 60 to obtain air flow difference 2042 2152 110 CFM 3 Subtract the total system static from 0 50 and divide this differ ence by the difference in ESP values in the table 0 60 0 5...

Страница 39: ...269441 UIM A 0407 Unitary Products Group 39 SECTION XI WIRING DIAGRAM FIGURE 41 Wiring Diagram...

Страница 40: ...o change without notice Printed in U S A 269441 UIM A 0407 Copyright by York International Corp 2007 All rights reserved Supersedes 167569 UIM A 1205 Unitary 5005 Norman Product York OK Group Drive 73...

Отзывы: