![York Predator BP078 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/york/predator-bp078/predator-bp078_installation-manual_4151013010.webp)
127421-YIM-C-0606
10
Unitary Products Group
FIGURE 7 -
UNIT CENTER OF GRAVITY
CLEARANCES
All units require particular clearances for proper operation
and service. Refer to Table 7 for clearances required for con-
struction, servicing, and proper unit operation
.
Unit Model Number
X
Y
BP078
47 1/2
25 1/2
BP090
38
23
BP102
47 1/2
25 1/2
BP120
47 1/2
25 1/2
BP150
47 1/2
25 1/2
X
Y
LEFT
FRONT
Do not permit overhanging structures or shrubs to
obstruct condenser air discharge outlet, combustion
air inlet or vent outlets.
FIGURE 8 -
UNIT DIMENSIONS
)RU%DVHUDLO
'LPHQVLRQV
6HH'HWDLO$
&RQYHQLHQFH
3RZHU
2XWOHW
(QWU\
3RZHU
(QWU\
&RQWURO
(QWU\
3RZHU
(QWU\
/()7
)5217
)RU'UDLQ
'LPHQVLRQV
6HH'HWDLO%
;
TABLE 6: UNIT HEIGHT
Unit Model Number
X
BP078
50 3/4
BP090
42
BP102
50 3/4
BP120
50 3/4
BP150
50 3/4
TABLE 7:
UNIT CLEARANCES
Top
*
*.
Units must be installed outdoors. Overhanging struc-
ture or shrubs should not obstruct condenser air dis-
charge outlet.
72”
Right
12”
Front
36”
Left
36”
Rear
†
†.
To remove the slide-out drain pan, a rear clearance of
sixty inches is required. If space is unavailable, the
drain pan can be removed through the front by separat-
ing the corner wall.
36”
Bottom
‡
‡.
Units may be installed on combustible floors made from
wood or class A, B or C roof covering materials.
0”
Содержание Predator BP078
Страница 27: ...127421 YIM C 0606 Unitary Products Group 27 TABLE 24 7 1 2 TON STANDARD MOTOR DOWN SHOT BLOWER PERFORMANCE1 ...
Страница 33: ...127421 YIM C 0606 Unitary Products Group 33 TABLE 35 7 1 2 TON OPTIONAL MOTOR SIDE SHOT BLOWER PERFORMANCE1 ...
Страница 54: ...127421 YIM C 0606 54 Unitary Products Group ...
Страница 55: ...127421 YIM C 0606 Unitary Products Group 55 ...