As soon as a unit is received, it should be inspected for possible dam-
age during transit. If damage is evident, the extent of the damage
should be noted on the carrier’s freight bill. A separate request for
inspection by the carrier’s agent should be made in writing. Also, before
installation the unit should be checked for screws or bolts, which may
have loosened in transit. There are no shipping or spacer brackets
which need to be removed.

FURNACE LOCATION AND CLEARANCES

The furnace shall be located using the following guidelines:

1.

Where a minimum amount of air intake/vent piping and elbows will
be required.

2.

As centralized with the air distribution as possible.

3.

Where adequate combustion air will be available (particularly
when the appliance is not using outdoor combustion air).

4.

Where it will not interfere with proper air circulation in the confined
space.

5.

Where the outdoor combustion air/vent terminal will not be blocked
or restricted. Refer to “COMBUSTION AIR / VENT CLEAR-
ANCES” located in SECTION VII of these instructions. These min-
imum clearances must be maintained in the installation.

6.

Where the unit will be installed in a level position with no more
than 1/4” (6.4 mm) slope side-to-side and front-to-back to provide
proper condensate drainage.

Installation in freezing temperatures:

1.

Furnace shall be installed in an area where ventilation facilities
provide for safe limits of ambient temperature under normal oper-
ating conditions. Ambient temperatures must not fall below 32°F
(0°C) unless the condensate system is protected from freezing. 

2.

Do not allow return air temperature to be below 55º F (13° C) for
extended periods. To do so may cause condensation to occur in
the main heat exchanger, leading tp premature heat exchanger
failure.

3.

If this furnace is installed in any area where the ambient tempera-
ture may drop below 32° F (0° C), a UL listed self-regulated heat
tape must be installed on any condensate drain lines. It is recom-
mended that self regulating heat tape rated at least 3 watts per
foot be used. This must be installed around the condensate drain
lines in the unconditioned space. Always install the heat tape per
the manufacturer's instructions. Cover the self-regulating heat
tape with fiberglass, Armaflex or other heat resistant insulating
material. 

4.

If this unit is installed in an unconditioned space and an extended
power failure occurs, there will be potential damage to the conden-
sate trap, drain lines and internal unit components. Following a
power failure situation, do not operate the unit until inspection and
repairs are performed.

Clearances for access:

Ample clearances should be provided to permit easy access to the unit.
The following minimum clearances are recommended:

1.

Twenty-four (24) inches (61 cm) between the front of the furnace
and an adjacent wall or another appliance, when access is
required for servicing and cleaning.

2.

Eighteen (18) inches (46 cm) at the side where access is required
for passage to the front when servicing or for inspection or
replacement of flue/vent connections.

In all cases, accessibility clearances shall take precedence over clear-
ances for combustible materials where accessibility clearances are
greater.

Installation in a residential garage:

A gas-fired furnace for installation in a residential garage must be
installed so the burner(s) and the ignition source are located not less
than 18 inches (46 cm) above the floor, and the furnace must be located
or protected to avoid physical damage by vehicles.

The furnace area must not be used as a broom closet or for any
other storage purposes, as a fire hazard may be created. Never
store items such as the following on, near, or in contact with the fur-
nace.

1. Spray or aerosol cans, rags, brooms, dust mops, vacuum

cleaners or other cleaning tools.

2. Soap powders, bleaches, waxes or other cleaning com-

pounds; plastic items or containers; gasoline, kerosene, ciga-
rette lighter fluid, dry cleaning fluids or other volatile fluid.

3. Paint thinners and other painting compounds.
4. Paper bags, boxes or other paper products

Never operate the furnace with the blower door removed. To
do so could result in serious personal injury and/or equipment
damage.

FOR FURNACES INSTALLED IN THE COMMON-

WEALTH  OF MASSACHUSETTS ONLY

For all side wall horizontally vented gas fueled equipment installed in
every dwelling, building or structure used in whole or in part for resi-
dential purposes, including those owned or operated by the Com-
monwealth and where the side wall exhaust vent termination is less
than seven (7) feet above finished grade in the area of the venting,
including but not limited to decks and porches, the following require-
ments shall be satisfied:

1.

INSTALLATION OF CARBON MONOXIDE DETECTORS. 

At

the time of installation of the side wall horizontal vented gas
fueled equipment, the installing plumber or gasfitter shall
observe that a hard wired carbon monoxide detector with an
alarm and battery back-up is installed on the floor level where
the gas equipment is to be installed. In addition, the installing
plumber or gasfitter shall observe that a battery operated or
hard wired carbon monoxide detector with an alarm is installed
on each additional level of the dwelling, building or structure
served by the side wall horizontal vented gas fueled equipment.
It shall be the responsibility of the property owner to secure the
services of qualified licensed professionals for the installation of
hard wired carbon monoxide detectors

a.

In the event that the side wall horizontally vented gas
fueled equipment is installed in a crawl space or an attic,
the hard wired carbon monoxide detector with alarm and
battery back-up may be installed on the next adjacent floor
level.

b.

In the event that the requirements of this subdivision can
not be met at the time of completion of installation, the
owner shall have a period of thirty (30) days to comply with
the above requirements; provided, however, that during
said thirty (30) day period, a battery operated carbon mon-
oxide detector with an alarm shall be installed.

2.

APPROVED CARBON MONOXIDE DETECTORS. 

Each car-

bon monoxide detector as required in accordance with the
above provisions shall comply with NFPA 720 and be ANSI/UL
2034 listed and IAS certified.

3.

SIGNAGE. 

A metal or plastic identification plate shall be perma-

nently mounted to the exterior of the building at a minimum
height of eight (8) feet above grade directly in line with the
exhaust vent terminal for the horizontally vented gas fueled
heating appliance or equipment. The sign shall read, in print
size no less than one-half (1/2) inch in size, "

GAS VENT

DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUC-
TIONS

".

4.

INSPECTION. 

The state or local gas inspector of the side wall

horizontally vented gas fueled equipment shall not approve the
installation unless, upon inspection, the inspector observes car-
bon monoxide detectors and signage installed in accordance
with the provisions of 248 CMR 5.08(2)(a)1 through 4.

Improper installation in an ambient below 32ºF (0.0° C) could create
a hazard, resulting in damage, injury or death.

Содержание FC9C UP Series

Страница 1: ...l codes LIST OF SECTIONS FURNACE DESCRIPTION 1 SAFETY 1 DUCTWORK 4 FILTERS 6 GAS PIPING 7 ELECTRICAL POWER 8 COMBUSTION AIR AND VENT SYSTEM 14 CONDENSATE PIPING 20 SAFETY CONTROLS 21 START UP AND ADJU...

Страница 2: ...as listed under Clearances to Combustibles in Table 1 Provide clearances for servicing ensuring that service access is allowed for both the burners and blower These models ARE NOT CSA listed or appro...

Страница 3: ...e floor and the furnace must be located or protected to avoid physical damage by vehicles The furnace area must not be used as a broom closet or for any other storage purposes as a fire hazard may be...

Страница 4: ...OTE When attaching duct flange do not shoot the screw down into the casing Use the formed flange intended for duct flange attachment The duct system is a very important part of the installation If the...

Страница 5: ...ndi cate the presence of leaks in the heat exchanger This access cover shall be attached in such a manner as to prevent leaks TABLE 2 Minimum Duct Sizing For Proper Airflow Input Airflow Return1 Recta...

Страница 6: ...r this require the use of high velocity fil ters 2 Air flows above 1800 CFM require either return from two sides or one side plus bottom SIDE RETURN FILTER INSTALLATION Locate and mark the side return...

Страница 7: ...l At elevations above 4 000 feet the furnace will automatically reduce it s input rate if necessary to maintain good combustion If the natural gas being supplied has also been derated by the gas suppl...

Страница 8: ...o Furnace Diag nostics section of the User s Information Maintenance Ser vice Manual provided with this furnace LOW VOLTAGE CONTROL WIRING CONNECTIONS Install the field supplied thermostat by followin...

Страница 9: ...age Compressor Y2 Second Stage Compressor C 24 Volt Common R 24 Volt Hot Y1 Single Stage Compressor VARIABLE SPEED MODULATING FURNACE CONTROL G Fan VARIABLE SPEED MODULATING FURNACE Y Y2 Second or Ful...

Страница 10: ...Move HUMIDISTAT jumper to YES if humidistat is to be used FL9C FC9C PC9 ID MODELS External Humidistat Optional Open on Humidity Rise 24VAC Humidifier Optional External Humidistat Optional Open on Hum...

Страница 11: ...n HM Humidistat Step 1 of Thermostat User Configuration Menu must be set to MLTISTG E W1 First Stage Heat 24VAC Humidifer Optional C 24 Volt Common R 24 Volt Hot Y1 Single Stage Compressor VARIABLE SP...

Страница 12: ...l C 24 Volt Common R 24 Volt Hot Y1 Single Stage Compressor VARIABLE SPEED MODULATING FURNACE CONTROL G Fan VARIABLE SPEED MODULATING FURNACE Y Y2 Second or Full Stage Compressor HUM Dehumidification...

Страница 13: ...09137 18395 031 01996 340512 031 09178 1 FL9C FC9C PC9 ID MODELS YZE OD MODELS YZH H 5 H 8 C 24 Volt Common R 24 Volt Hot Y1 First Stage Compressor O Reversing Valve Energized in Cool L Malfunction L...

Страница 14: ...for a particular model then the vent can have 65 equivalent feet of pipe AND the combustion air intake can have another 65 equivalent feet of pipe 3 Three vent terminal elbows two for the vent and on...

Страница 15: ...ystems from the furnace to the out side termination B Ventilated combustion air systems from the furnace to the attic or crawl space termination 6 Disassemble the combustion air and vent piping apply...

Страница 16: ...ns 9 inches 23 cm for models 50 000 BTUH 15 kW 12 inches 30 cm for models 50 000 BTUH 15 kW C Clearance to permanently closed window 12 inches 30 cm 12 inches 30 cm D Vertical clearance to ventilated...

Страница 17: ...ombustion air systems must be installed so the vent and the combustion air pipes terminate in the same atmospheric zone Refer to Figures 14 or 15 VENTING MULTIPLE UNITS Multiple units can be installed...

Страница 18: ...ical vent Care should be taken to locate side vented systems where trees or shrubs will not block or restrict supply air from entering the terminal Also the terminal assembly should be located as far...

Страница 19: ...ENTILATED ATTIC TOP ABOVE INSULATION OPTIONAL INLET a OUTLET AIR a VENTILATED CRAWL SPACE GAS WATER HEATER VENTILATED ATTIC TOP ABOVE INSULATION GAS VENT GABLE VENT SOFFIT VENT GAS WATER HEATER INLET...

Страница 20: ...bustion Air The ventilated attic space or a crawl space from which the combustion air is taken must comply with the requirements specified in AIR SOURCE FROM OUTDOORS in this instruction or in Section...

Страница 21: ...s sensor monitors combus tion airflow through furnace and piping systems If any of the conditions listed above are detected by the pressure sensor the control board will prevent a hazardous condition...

Страница 22: ...ing any pressure testing of that system at test pres sures in excess of 1 2 PSI 3 45 kPa The furnace must be isolated from the gas supply piping system by closing the equipment shutoff valve during an...

Страница 23: ...3600 then divided by the time it took to measure 0 10 m3 of gas from the gas meter For Propane LP Gas multiply the Heat content of the gas MJ m3 or Default 93 15 times 0 10 m3 of gas measured at the...

Страница 24: ...nt screws on main gas valve 2 Turn gas and electrical supplies on and follow the operating instructions to place the unit back in operation 3 Adjust manifold pressure by adjusting gas valve regulator...

Страница 25: ...s fan operation can be adjusted as desired This is done my moving the RECIRC jumper on the control board to give the desired airflow The jumper has three positions The A position delivers maximum air...

Страница 26: ...rate 6 The firing rate is automatically adjusted to meet demand increas ing gradually to maximum 100 firing rate if the thermostat is not satisfied within a defined time 7 When the thermostat R and W...

Страница 27: ...five minutes indi cating that the blower motor or blower wheel has failed Twelve Red Flashes ID plug is not present or not connected properly check for loose plug or loose wires in plug Steady On Red...

Страница 28: ...730 530 22 4 16 1 20 7 15 0 C C 630 530 590 500 17 8 15 0 16 7 14 2 D C 80 000 100 000 INPUT 4 Ton 100 000 INPUT 5 Ton 80 000 100 000 INPUT 4 Ton 100 000 INPUT 5 Ton JUMPER SETTINGS CFM CFM m min m mi...

Страница 29: ...50 w c 125 Pa to obtain a percentage 0 58 0 50 0 60 0 50 0 8 Multiply percentage by airflow difference to obtain airflow reduction 0 8 X 110 88 Subtract airflow reduction value to airflow 0 50 w c 125...

Страница 30: ...A 292278 UIM A 0108 Copyright by Unitary Products Group 2008 All rights reserved Supersedes 172078 YIM C 0606 Unitary 5005 Norman Product York OK Group Drive 73069 SECTION XII WIRING DIAGRAM FIGURE 26...

Отзывы: