Mechanical Installation
Part 2
Step 16
2/2
Parts Required:
➔
Timing Belt - X Axis
Route the Timing Belt along the back of
the X Axis Gantry Rail, and through the
Belt Tensioner - the belt must go on the
inside of the Belt Tensioner housing, as
shown.
Slide the other end of the Timing Belt
into the slot on the left side of the X
Axis Gantry.
Tighten the belt using the knob on the
end of the Belt Tensioner - allowing
smooth movement of the X Axis Gantry
Содержание 6550-PRO
Страница 1: ...YORAHOME CNC LASER ENGRAVING MACHINE 6550 PRO USER MANUAL Version 1 0 June 2022...
Страница 6: ...Contents Part 1 Packing List Part 2 Mechanical Installation Part 3 Software Introduction Part 4 FAQ...
Страница 68: ...Software Introduction Lightburn Part 3 9 Click on OK to return to the main Lightburn screen...
Страница 76: ...WWW YORAHOME COM SUPPORT YORAHOME COM...