Mechanical Installation
Part 2
Step 7
Parts Required:
➔
Left Side Rail with Left Motor
Assembly
➔
Timing Belt
➔
2 Timing Belt Clamp Screws
Route Timing Belt (with teeth down) OVER
the synchronous wheel on the Y axis
stepper motor, and UNDER the rollers, as
shown.
Secure belt at both ends of the rail as
shown - do not overtighten and twist belt.
Belt should be taut, but still allow free
movement on the motor assembly.
Set Left Side Rail Assembly aside until
Frame Assembly steps.
Ensure screw hole is
accessible
Содержание 6550-PRO
Страница 1: ...YORAHOME CNC LASER ENGRAVING MACHINE 6550 PRO USER MANUAL Version 1 0 June 2022...
Страница 6: ...Contents Part 1 Packing List Part 2 Mechanical Installation Part 3 Software Introduction Part 4 FAQ...
Страница 68: ...Software Introduction Lightburn Part 3 9 Click on OK to return to the main Lightburn screen...
Страница 76: ...WWW YORAHOME COM SUPPORT YORAHOME COM...