
www.yonanas.com
CHUTE ASSEMBLY
1.
Place bottom of Gasket into the
Bottom Cap.
2.
Carefully set the Blade Cone on the Gasket.
3.
Screw Bottom Cap into the Chute
and Blade Cover.
ASSEMBLY
2
Rotate counterclockwise until chute
assembly clicks into locked position
Place chute assembly on base
Interlock mechanism in base
prevents motor from running when
chute assembly is not in place.
1
2
ELECTRICAL REQUIREMENTS
Volts: 120V | Hertz: 60 Hz
Watts: 200W
1.
Power Switch
2.
Electrical Cord
Do not use an extension cord. If the
provided cord is too short, move the
appliance closer to an outlet. Place bowl in
front of unit underneath spout.
NOTE: There is a top and bottom to the Gasket. The top
measures 3-3/4 inches and the bottom measures 4-1/4
inches. The Gasket fi ts snuggly in the Bottom Cap.
1
TOP 3-3/4”
BOTTOM 4-1/4”
ALWAYS
insert gasket into cap
BEFORE
screwing cap into blade cover.
3
TOP 3-3/4”
BOTTOM 4-1/4”
2
1
ON
OFF