YOKOGAWA UPM101 Скачать руководство пользователя страница 3

4.2  Wiring Diagrams 

Single-phase 2-wire

A-

K

L

1

N

VT

-

-

+

+

-

+

B+ SG D2 D2 D1 D1 N1 L1 PE

P1 P2

1S 1L

K

L

Dedicated

CT

RS-485

Fuse

Signal

ground

Power

supply

Pulse

output-2

of electric

energy

Pulse

output-1

of electric

energy

Load

Established

instruments

Established

CT

Power

supply

Single-phase 3-wire

A-

K

L

1

N

2

VT

K

L

-

-

+

+

-

+

B+ SG D2 D2 D1 D1 N1 L1 PE

P1 P0 P2

1S 1L

2S 2L

K

L

K

L

Dedicated

CT

Power

supply

RS-485

Fuse

Signal

ground

Power

supply

Pulse

output-1

of electric

energy

Pulse

output-2

of electric

energy

Load

Established

instruments

Dedicated

CT

Established

CT

Established

CT

Three-phase 3-wire

A-

K

L

1
2

3

VT

K

L

-

-

+

+

-

+

B+ SG D2 D2 D1 D1 N1 L1 PE

P1 P2 P3

1S 1L

3S 3L

R

S

T

K

L

K

L

Dedicated

CT

Power

supply

RS-485 Signal

ground

Power

supply

Pulse

output-1

of electric

energy

Pulse

output-2

of electric

energy

Load

Established

instruments

Dedicated

CT

Established

CT

Fuse

Established

CT

Three-phase 4-wire

A-

K

L

1

R

S

T

N

2

3

N

VT

K

L

K

L

K

L

K

L

K

L

-

-

+

+

-

+

B+ SG D2 D2 D1 D1 N1 L1 PE

P1 P2 P3 P0 1S 1L 2S 2L 3S 3L

Dedicated

CT

RS-485 Signal

ground

Power

supply

Pulse

output-1

of electric

energy

Pulse

output-2

of electric

energy

Load

Established

instruments

Established CT

Established CT

Fuse

Dedicated

CT

Dedicated

CT

Established CT

Power

supply

 NOTE

 

Be sure to use the dedicated CT for the UPM101.

 

When connecting the secondary-side cable of the dedicated CT to the UPM101, 

the cable should be twisted.

 

If extending the secondary-side cable of the dedicated CT, use two-core twisted-

pair cable.

4.3  Connections for RS-485 Communication 

 

(FG)

Approximately 1.2 km maximum length (up to 31 units)

Ethernet

RS-485

Ethernet

/

RS-485

Converter

(A-) (B+) (SG)

(A-) (B+) (SG)

(A-) (B+) (SG)

(A-) (B+) (SG)

RS-485

RS-485

UPM101

UPM101

UPM101

Terminator

PC

 CAUTION

 

RS-485 communication with the UPM101 is based on a 2-wire system. 

Note the following:

(1)  The SG terminal (SG) is connected to match the signal level of the RS-485 

communication line. Connect the SG terminal without grounding it.

(2)  Connect all shield lines (FG) to provide noise protection on the RS-485 

communication line, and ground them in one location.

(3)  When using shielded twisted-pair cable, use the shield line as FG without 

connecting the SG terminal.

IM 77C01J01-00EN

3

Содержание UPM101

Страница 1: ...ribes how the operator should exercise special care to avoid electric shock or other dangers that may result in injury or loss of life This label denotes that a protective ground terminal is necessary...

Страница 2: ...d crimp on terminals for use in connecting to the input and power supply terminals B d 2 d 2 B Round Type Open end Type Round Type Specification Size d 2 Size B Recommended Tightening Torque Applicabl...

Страница 3: ...1L 2S 2L 3S 3L Dedicated CT RS 485 Signal ground Power supply Pulse output 1 of electric energy Pulse output 2 of electric energy Load Established instruments Established CT Established CT Fuse Dedica...

Страница 4: ...rgy 2 of rdg with rated input Active energy 2 of rdg with rated input integration not performed on minus side Reactive energy 2 of rdg with rated input for UPM101 with optional measuring function Rege...

Страница 5: ...about 5 seconds and then the display is changed to the measured value display To change measured value display To change to the parameter setting display Each time you press the SET ENT key on the mea...

Страница 6: ...hat the product of the ratio does not exceed 9999 MW by calculated by secondary side rated power VT ratio CT ratio For the UPM101 set the CT ratio of the established CT where the dedicated CT is to be...

Страница 7: ...d display the next parameter Next press the Move key to make the first digit flash Hold the SET ENT key down for about 3 seconds to return to the measured value display 6 2 Settings Related to Integra...

Страница 8: ...splay the parameter set value Press the Up key or Down key to display ON or OFF After setting the parameter press the SET ENT key once All digits flash confirmation display Press the SET ENT key on th...

Страница 9: ...Integral resolution kWh Down key Move key Up key SET ENT key Measured value display Communication light Power light COS light RST light Integrated pulse light Unit light IMPORTANT Pressing this switch...

Страница 10: ...rgy 3 1 Resetting Voltage Maximum Minimum Values and Current Maximum Value The following procedure simultaneously resets voltage maximum value voltage minimum value and current maximum value Measured...

Страница 11: ...Energy Apparent Energy Optional Electric Energy Instantaneous Active Regenerative Power Instantaneous Reactive Power Instantaneous Apparent Power Instantaneous Voltage Instantaneous Current Instantan...

Страница 12: ...A 100VA or greater but less than 1kVA 0 0 to 999 9 VA 1kVA or greater but less than 10kVA 0 to 9999 VA 10kVA or greater but less than 100kVA 0 00 to 99 99 kVA 100kVA or greater but less than 1MVA 0 0...

Отзывы: