![YOKOGAWA DpharpEJX vigilantplant EJX910A Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/yokogawa/dpharpejx-vigilantplant-ejx910a/dpharpejx-vigilantplant-ejx910a_user-manual_3750163010.webp)
IM 01C25R01-01E
2-2
2. About Multivariable Transmitter
IMPORTANT
Before performing flow configuration in the field,
make sure the installation location meets all
safety requirements.
START
Unpacking and
Confirmation of
Specifications
(see Chapter3)
Review the
Handling Cautions
(see Chapter3)
Hazardous
Location?
Nonincendive
Location
Flow Configure
@Bench
Connect
Power Supply
Connect Personal
Computer
Perform
Configuration
Tasks
(see Chapter2)
Review Installation
Considerations
(see Chapter5)
Mount Transmitter
(see Chapter5)
Perform Field
Calibration Tasks
(see Chapter8)
DONE
Review the Manual
(see Chapter3)
Review the Manual
(see Chapter3)
Make Process
Connections
(see Chapter6)
Wiring
(see Chapter7)
Check for Leaks
Flow Configure
@Field
Perform
ConfigurationTasks
(see Chapter2)
Yes
Yes
Yes
Yes
No
No
No
No
F0202E.EPS
Figure 2.2 Installation Flowchart