i
CONTENTS
IM 01C25B01-01E
FD No. IM 01C25B01-01E
5th Edition: July 2006(YK)
All Rights Reserved, Copyright © 2004, Yokogawa Electric Corporation
CONTENTS
Regarding This Manual ................................................................................. 1-1
1.1
Safe Use of This Product .................................................................... 1-2
ATEX Documentation .......................................................................... 1-4
Model and Specifications Check ......................................................... 2-1
Selecting the Installation Location ...................................................... 2-2
Pressure Connection ........................................................................... 2-2
Waterproofing of Cable Conduit Connections .................................... 2-2
Restrictions on Use of Radio Transceivers ........................................ 2-2
Insulation Resistance and Dielectric Strength Test ............................ 2-2
Installation of an Explosion-Protected Instrument .............................. 2-3
FM Approval ................................................................................. 2-3
CSA Certification .......................................................................... 2-5
CENELEC ATEX (KEMA) Certification ........................................ 2-7
IECEx Certification ..................................................................... 2-10
2.10 EMC Conformity Standards .............................................................. 2-11
2.11 Pressure Equipment Directive (PED) ............................................... 2-11
2.12 Low Volage Directive ........................................................................ 2-12
Changing the Process Connection ..................................................... 4-2
Swapping the High/Low-pressure Side Connection ........................... 4-3
Rotating Pressure-detector Section 180
..................................... 4-3
Using the Communicator .............................................................. 4-3
Rotating Transmitter Section .............................................................. 4-4
Changing the Direction of Integral Indicator ....................................... 4-4
INSTALLING IMPULSE PIPING ................................................................... 5-1
Impulse Piping Installation Precautions .............................................. 5-1
Connecting Impulse Piping to a Transmitter ................................ 5-1
Routing the Impulse Piping .......................................................... 5-2
Impulse Piping Connection Examples ................................................ 5-4
Selecting the Wiring Materials ............................................................ 6-1
Connections of External Wiring to Terminal Box ................................ 6-1
Power Supply Wiring Connection ................................................ 6-1