User’s
Manual
Yokogawa Electric Corporation
1
2
3
4
5
6
7
8
EJA Series Differential Pressure and
Pressure Transmitters
Installation Manual
IM 01C22A01-01E
IM 01C22A01-01E
2nd Edition
CD-ROM included
1. Introduction
1.1
For Safe Use of Product ..............................................2
1.2 Warranty
......................................................................2
1.3 ATEX
Documentation
..................................................4
2. Handling
Cautions
2.1 Model
and
Speci
fi
cations Check .................................5
2.2
Selecting the Installation Location ..............................5
2.3 Pressure
Connection
..................................................6
2.4
Installation of Explosion Protected Type .....................6
2.5
EMC Conformity Standards ..................................... 13
2.6
PED (Pressure Equipment Directive) ...................... 13
2.7 Low
Voltage
Directive
............................................... 14
3. Installation
3.1 Mounting................................................................... 15
3.2
Mounting the Diaphragm Seals ............................... 15
3.3
Diaphragm Seals Installation Consideration ............ 16
3.4 Af
fi
xing the Te
fl
on Film ............................................. 17
3.5 Rotating
Transmitter
Section
.................................... 18
3.6
Changing the Direction of Integral Indicator............. 18
4.
Installing Impulse Piping
4.1
Impulse Piping Installation Precautions ................... 19
4.2
Impulse Piping Connection Examples ..................... 21
4.3
Process Piping Installation Precautions ................... 22
5. Wiring
5.1 Wiring
Precautions
................................................... 23
5.2
Connections of External Wiring to Terminal Box ...... 23
5.3 Wiring
....................................................................... 23
5.4 Grounding
................................................................ 25
5.5
Power Supply Voltage and Load Resistance ........... 25
6. Operation
6.1
Preparation for Starting Operation ........................... 26
6.2 Zero
Point
Adjustment
.............................................. 27
7.
Errors and Countermeasures
8. Parameter
Summary
Содержание Dpharp vigilantplant EJA110A
Страница 2: ......