Rev-1
IM 01C25B01-01E
Revision Information
Title
:
Differential Pressure and Pressure Transmitters
EJ
110
, EJ
120
, EJ
130
, EJ
310
, EJ
430
, and EJ
440
Manual No. : IM 01C25B01-01E
Edition
Date
Page
Revised Item
1st
Mar. 2004
—
New publication
15th
Oct. 2014
2-2
2.8
• Add information for 1 to 5 V output.
2-5
2.9.1
• Add information for 1 to 5 V output.
2-7, 2-8
2.9.2
• Add information for 1 to 5 V output.
2-9 to 2-11
2.9.3
• Add information for 1 to 5 V output.
2-13
2.9.4
• Add EPL code. Revise applicable standard. Add information for
1 to 5 V output. Add note for electro static charge. Add electrical
connection.
2-14
2.10
• Add standard for PROFIBUS.
6-1
6.3
• Add Figure 6.1 Terminal.
6-2
6.3.3
• Add information for 1 to 5 V output.
6-3
6.4
• Add information for 1 to 5 V output.
6-5
6.6
• Add applicability.
7-6
7.6.1
• Add “10.Device information” in Figure 7.9.
7-7
7.6.3
• Add note in the figure.
7-8
7.6
• Add 7.6.6 Pressure LRV/URV Configuration.
7-9
7.6
• Add 7.6.8 Output Mode Configuration and 7.6.9 Display Out 1
Configuration.
8-9
8.5.3
• Correct AL31 output operation.
9-2 to 9-4
9.1
• Add information for 1 to 5 V output.
9-5
• Add EMC standard for PROFIBUS and EMI specification.
9-12 to 9-17
9.2
• Add output signal code Q
9-19
9.3
• Revise the description for SU2 and SF2.
9-35
9.4
• Add information for 1 to 5 V output.
16th
June 2015
1-3
1.1
• Add (g) and (h).
2-1, 2-12
Replace name plate figure.
2-4 to 2-7
NEMA TYPE 4X → Type 4X.
2-6, 2-7
2.9.2
• Add C22.2 No.61010-2-030
2-14
2.5
• for Profibus → for Fieldbus
2-15
2.12
• Add C22.2 No.61010-1, C22.2 No.61010-2-030
7-7
7.6.3
• Add note for software revision 3.01.
7-6 to 7-10
Change layout.
9-5
9.1
• Modify ‘EMC conformity standards.’
9-26
9.4
• Add Bottom process connection for measurement span code F.
17th
July 2015 2-5, 2-7, 2-9, 2-14 Delete /V1F.
2-12 to 2-15
2.9.4
• Add SU21. Add a and b.
9-5
9.1
• Revise descriptions for EMC conformity standards.
9-6 to 9-17
9.2
• Add material for mounting bracket code D and K.
9-18
9.2
• Delete #.
9-19
9.3
• Add SU21.
18th
Sep. 2015
9-3
9.1
• Add condition for Burst Pressure Limits and Maximum Pressure
Limits.
9-21
9.3
• Add /HD.
9-22 to 9-25
9.4
• Add /HD.