![YOKOGAWA DP harp EJX Series Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/yokogawa/dp-harp-ejx-series/dp-harp-ejx-series_user-manual_3527195003.webp)
Toc-2
IM 01C25B01-01E
Impulse Piping Installation Precautions ........................................................5-1
Connecting Impulse Piping to a Transmitter ......................................5-1
Routing the Impulse Piping ................................................................5-3
Impulse Piping Connection Examples ...........................................................5-4
Connections of External Wiring to Terminal Box ..........................................6-1
Power Supply Wiring Connection ......................................................6-1
External Indicator Connection............................................................6-2
Communicator Connection ................................................................6-2
Check Meter Connection ...................................................................6-2
Status Output Connection ..................................................................6-3
............................................................................6-3
Power Supply Voltage and Load Resistance .................................................6-5
Adjusting Zero Point for Differential Pressure Transmitters
Adjusting Zero Point for Gauge/Absolute Pressure Transmitters ....7-3
Venting or Draining Transmitter Pressure-detector Section .......................7-5
Draining Condensate .........................................................................7-5
Local Parameter Setting (LPS) Overview ..........................................7-6
Activating Local Parameter Setting ...................................................7-8
Parameter Setting Review .................................................................7-8
.....................................................................7-9
.................................................................7-9
...............................................................7-9
Pressure LRV/URV Configuration
...................................................7-10
Damping Time Constant Configuration
...........................................7-10
.............................................................7-10
.............................................................7-10
Re-range by applying actual pressure (LRV/URV). ......................... 7-11