GB Modules Installation and User Manual  Page 11 

80°~87°

TRANSFER REQUIREMENTS

UNPACKING INSTRUCTIONS

It  is  strictly  forbidden  for  people  to  stand  on  both  sides  of  the  forklift  during  the 

operation, and there is a risk of the box falling over and causing injury to people 

if the operation speed is too fast, and the stacking of boxes is strictly forbidden.

When lifting, need to use lifting tools with sufficient tension to ensure that the center 

of gravity of the box is stable and to make suitable support structures on the top 

of the package, such as wooden boards with the same length and width as the 

package, to ensure that the top of the modules is not squeezed.

Before unpacking, please check whether the product serial number and information 

on the external box are correct, read the unpacking instructions carefully, prohibit 

the  use  of  customized  unpacking  methods,  prohibit  violent  removal  to  avoid 

scratching the modules, please refer to the recommended unpacking steps and 

tools.  Unpacking  work  must  be  operated  by  2  or  more  people,  wear  cut-proof 

insulated gloves, and other labor protection requirements of PV plant construction 

specifications need to be met.

Unpacking must be done with anti-tilting brackets, please contact your customer 

manager for the specific requirements of the anti-tilting bracket.

2.  Safety  ropes  are  required  to  secure  the  modules  to  the  forklift  with  a  tensile 

strength greater than 2000 kgf.

2. Pass the forearm of the anti-tilting bracket through the pallet, insert the two bolts 

into the front round hole of the anti-tilting bracket, and adjust the support angle of 

the anti-tilting bracket so that the angle with the ground is between 80° and 87°.

3. When placing it, need to wait for the packing box to be stable before untying the 

safety rope.

4. Make sure the pallet is separated from the forks and then exit slowly.

Notes:

- Fork length needs to be more than 1.1 m, gantry height needs to be more than 1.7 

m and width more than 1.5 m, gantry can withstand more than 1.5 tons pressure.

- The top of the gantry needs to be placed with cushioning material.

- These transfer requirements apply to upright packaging modules.

Note: 

- These unpacking instructions apply to upright packaging modules.

1. Forks enter in the direction of the long side of the pallet, close to the pallet and 

prohibit slamming against the modules.

1. Place the package on the flat working ground, cut the packing belts and remove 

the wooden brackets.

3. Remove the packing belts and carton (the cardboard on one side of the anti-

tilting bracket can be retained), leaving only 1 or 2 internal belts, then carefully push 

the modules so that they rest diagonally against the anti-tilting bracket.

4. Two people work together to carry the modules one by one, if there are any left 

over, secure the remaining modules to the anti-tilting bracket with tie-downs or 

place them flat on a pallet (no more than 20 pieces per pallet).

Содержание YLM 144CELL 182PERC

Страница 1: ...ication requirements has been verified by an independent certification laboratory This Installation and User Manual is available in different languages In cases of discrepancy between versions the Eng...

Страница 2: ...ng so may degrade performance or cause irreparable damage and will void any applicable warranties If it is necessary to store PV modules prior to installation the PV modules should remain inside the p...

Страница 3: ...suitable cross sectional areas that are approved for use at the maximum short circuit current of the PV module Yingli Solar recommends installers use only sunlight resistant cables qualified for dire...

Страница 4: ...ult in galvanic corrosion An addendum to UL Standard 1703 Flat Plate Photovoltaic Modules and Panels recommends metal combinations not exceed an electrochemical potential difference of 0 5 Volts The f...

Страница 5: ...hment Figure 12 Installation rails The large size modules are mounted with four outer holes with max mechanical loads of 5400 Pa snow front and 2400 Pa wind back Top down Clamps Third party clamps tha...

Страница 6: ...e materials that could scratch or damage the glass surface Failure to comply with these requirements may adversely affect the PV module performance Yingli Solar PV modules are designed to withstand hi...

Страница 7: ...l characteristics are within 10 percent of the indicated values of Isc Voc and Pmax under Standard Test Conditions irradiance of 1000 W m2 AM 1 5 spectrum and a cell temperature of 25 Refer to module...

Страница 8: ...f 14 20 N m The tightening steps as follows use torque wrench to tighten nut to target torque nut loosen 90 180 degrees finally tighten the nut to the target torque and reduce the torque attenuation 2...

Страница 9: ...ashers of minimum 1 4 mm thickness with an minimum outer diameter of 15 57 mm Modules can be attached using the mounting holes the number of mounting holes used for a single long side frame 2 includin...

Страница 10: ...when it is pressed down L represents the length of the long side of the module the described distances are from the module edge to the middle of the clamp The long side frames of the module are fixed...

Страница 11: ...ropes are required to secure the modules to the forklift with a tensile strength greater than 2000 kgf 2 Pass the forearm of the anti tilting bracket through the pallet insert the two bolts into the...