manualshive.com logo in svg
background image

Yingli Solar G/G Modules, Installation and User Manual 

page 8

YINGLI SOLAR G/G MODULES 

Module Supplement

Revision dat

e July 15th

, 2018  |  Applicable for IEC certified products  | 

 

The second edition

File name: Corporate Logo with Tagline / Vertical.ai

E L E C T R I C A L   C H A R AC T E R I S T I C S

Nameplate ratings are average values. The electrical characteristics are /- 10 percent of the indicated values of Isc, Voc, and Pmax under 
Standard Test Conditions (irradiance of 1000 W/m

2

, AM 1.5 spectrum, and a cell temperature of 25°C). Refer to module datasheets for specific power 

output tolerances. Note that not necessarily all power classes are available for all module series given in the first column of Table 3. Please refer to Table 
1 to see which power classes actually exist for which module series. 

Table 2: Connection points of modules

Modules that require       

Six (4) connection points

Modules that require       

Six (6) connection points

YGE G/G 60CL/F

YGE G/G 72CL/F

YLM G/G 60CL/F

YLM G/G 72CL/F

Table 3: Electrical characteristics

Series

Module 

P

max

V

mpp

I

mpp

V

oc

I

sc

Max. system 

voltage

Max. series fuse 

rating

[W]

[V]

[A]

[V]

[A]

[V]

[A]

YGE G/G 60CL/F

YL260PG2530L/F-1

260

30.3 

8.59 

37.7 

9.09 

1500

15

YL265PG2530L/F-1

265

30.5 

8.70 

37.8 

9.18 

1500

15

YL270PG2530L/F-1

270

30.7 

8.80 

37.9 

9.27 

1500

15

YL275PG2530L/F-1

275

31.0 

8.90 

37.9 

9.35 

1500

15

YL280PG2530L/F-1

280 

31.2 

8.98 

38.0 

9.43 

1500

15

YL285PG2530L/F-1

285 

31.4 

9.08 

38.1 

9.52 

1500

15

YGE G/G 72CL/F

YL315PG2536L/F-1

315

36.8 

8.56 

45.7 

9.12 

1500

15

YL320PG2536L/F-1

320

37.0 

8.64 

46.0 

9.18 

1500

15

YL325PG2536L/F-1

325

37.3 

8.72 

46.3 

9.24 

1500

15

YL330PG2536L/F-1

330

37.5 

8.80 

46.6 

9.30 

1500

15

YL335PG2536L/F-1

335

37.8 

8.86 

46.9 

9.36 

1500

15

YL340PG2536L/F-1

340

38.0 

8.95 

47.2 

9.42 

1500

15

YLM G/G 60CL/F

YL275DG2530L/F-2

275

31.7

8.70

38.3

9.11

1500

15

YL280DG2530L/F-2

280

32.0

8.77

38.5

9.16

1500

15

YL285DG2530L/F-2

285

32.3

8.83

38.7

9.21

1500

15

YL290DG2530L/F-2

290

32.6

8.90

38.9

9.26

1500

15

YL295DG2530L/F-2

295

32.9

8.97

39.1

9.31

1500

15

YL300DG2530L/F-2

300

33.2

9.04

39.3

9.36

1500

15

This supplement refers to modules of the following types:

Table 1: Module types

FAMILY

YGE G/G 60CL/F

YGE G/G 72CL/F

YLM

 

G/G 60CL/F

YLM G/G 72CL/F

TYPE

YL260PG2530L/F-1

YL315PG2536L/F-1

YL275DG2530L/F-2

YL330DG2536L/F-2

YL265PG2530L/F-1

YL320PG2536L/F-1

YL280DG2530L/F-2

YL335DG2536L/F-2

YL270PG2530L/F-1

YL325PG2536L/F-1

YL285DG2530L/F-2

YL340DG2536L/F-2

YL275PG2530L/F-1

YL330PG2536L/F-1

YL290DG2530L/F-2

YL345DG2536L/F-2

YL280PG2530L/F-1

YL335PG2536L/F-1

YL295DG2530L/F-2

YL350DG2536L/F-2

YL285PG2530L/F-1

YL340PG2536L/F-1

YL300DG2530L/F-2

YL355DG2536L/F-2

Содержание YGE G/G 60CL/F Series

Страница 1: ...trol Failure to comply with the requirements listed in this manual will invalidate the Limited Warranty for PV modules as provided by Yingli Solar at the time of sale to the direct customer Additional...

Страница 2: ...e short side of the box including the corresponding part of the upper lid and the bottom lid see Figure 4 Pay attention to not damage the modules during the cutting process Thirdly cut the two inner s...

Страница 3: ...party electronic devices connected to PV modules may lead to mismatching and must be installed according to the manufacturer s specified instructions Figure 6 Electrical diagrams of series and parall...

Страница 4: ...or optimal performance Yingli Solar recommends that the negative pole of the PV array be connected to ground Equipment Grounding The frame of the PV module as well as any exposed non current carrying...

Страница 5: ...in the mechanical mounting instructions of this installation manual The installation shall follow the instructions below If the installation method is different from this manual please contact Yingli...

Страница 6: ...taller or other qualified person The purpose of the PV system inspection is to ensure that all system components are functioning properly At a minimum this inspection should confirm the following All...

Страница 7: ...e glass surface to enhance power output and reduce dirt and dust buildup In order to avoid module damage do not clean PV modules with a power washer or pressure washer Do not use steam or corrosive ch...

Страница 8: ...8 9 18 1500 15 YL270PG2530L F 1 270 30 7 8 80 37 9 9 27 1500 15 YL275PG2530L F 1 275 31 0 8 90 37 9 9 35 1500 15 YL280PG2530L F 1 280 31 2 8 98 38 0 9 43 1500 15 YL285PG2530L F 1 285 31 4 9 08 38 1 9...

Страница 9: ...coefficient C 0 05 0 32 0 42 YLM G G 72CL F YL330DG2536L F 2 330 37 1 8 90 45 2 9 46 1500 15 YL335DG2536L F 2 335 37 4 8 96 45 4 9 51 1500 15 YL340DG2536L F 2 340 37 7 9 02 45 6 9 56 1500 15 YL345DG25...

Страница 10: ...n and User Manual page 10 CLAMP INSTALLATION DRAWINGS OF PV MODULES UNITS mm YGE G G 60CL YGE G G 72CL YLM G G 60CL YLM G G 72CL 992 1975 360 635 635 350 200 992 1975 360 635 635 350 200 360 953 345 9...

Страница 11: ...3 8 Grounding holes 8 6 1981 365 633 633 350 100 998 1981 32 1981 998 Drainage holes 8 3 8 Grounding holes 8 6 365 633 633 350 100 998 1664 32 1664 998 365 949 350 Drainage holes 8 3 8 100 Grounding h...

Отзывы: