manualshive.com logo in svg
background image

Y I N G L I S O L A R .CO M

©

 Yingli Energy Development Company Limited           

GB Modules Installation and User Manual  Page 1

2

 

80°~87°

UNPACKING INSTRUCTIONS

Before unpacking, please check whether the product serial number and information 

on the external box are correct, read the unpacking instructions carefully, prohibit 

the  use  of  customized  unpacking  methods,  prohibit  violent  removal  to  avoid 

scratching the modules, please refer to the recommended unpacking steps and 

tools.  Unpacking  work  must  be  operated  by  2  or  more  people,  wear  cut-proof 

insulated gloves, and other labor protection requirements of PV plant construction 

specifications need to be met.

Unpacking must be done with anti-tilting brackets, please contact your customer 

manager for the specific requirements of the anti-tilting bracket.

2.  Safety  ropes  are  required  to  secure  the  modules  to  the  forklift  with  a  tensile

strength greater than 2000 kgf.

2. Pass the forearm of the anti-tilting bracket through the pallet, insert the two bolts

into the front round hole of the anti-tilting bracket, and adjust the support angle of 

the anti-tilting bracket so that the angle with the ground is between 80° and 87°.

3. When placing it, need to wait for the packing box to be stable before untying the

safety rope.

4. Make sure the pallet is separated from the forks and then exit slowly.

Notes:

- Fork length needs to be more than 1.1 m, gantry height needs to be more than 1.7

m and width more than 1.5 m, gantry can withstand more than 1.5 tons pressure.

- The top of the gantry needs to be placed with cushioning material.

- These transfer requirements apply to upright packaging modules.

Note: 

- These unpacking instructions apply to upright packaging modules.

1. Forks enter in the direction of the long side of the pallet, close to the pallet and

prohibit slamming against the modules.

1. Place the package on the flat working ground, cut the packing belts and remove

the wooden brackets.

3. Remove the packing belts and carton (the cardboard on one side of the anti-

tilting bracket can be retained), leaving only 1 or 2 internal belts, then carefully push 

the modules so that they rest diagonally against the anti-tilting bracket.

4. Two people work together to carry the modules one by one, if there are any left

over, secure the remaining modules to the anti-tilting bracket with tie-downs or 

place them flat on a pallet (no more than 20 pieces per pallet).

T

ransport and 

h

andling

 for 

p

anels 

w

ith 

a length

 greater than 

2

278

 mm

TRANSFER REQUIREMENTS

It  is  strictly  forbidden  for  people  to  stand  on  both  sides  of  the  forklift  during  the 

operation, and there is a risk of the box falling over and causing injury to people if 

the operation speed is too fast, and the stacking of boxes is strictly forbidden.

When  lifting,  need  to  use  lifting  tools  with  sufficient  tension  to  ensure  that  the 

center of gravity of the box is stable and to make suitable support structures on 

the top of the package, such as wooden boards with the same length and width 

as the package, to ensure that the top of the modules is not squeezed.

Содержание PANDA 108CELL 182TOPCon

Страница 1: ...ication requirements has been verified by an independent certification laboratory This Installation and User Manual is available in different languages In cases of discrepancy between versions the Eng...

Страница 2: ...do not disassemble or modify Yingli Solar PV modules in any way Doing so may degrade performance or cause irreparable damage and will void any applicable warranties If it is necessary to store PV modu...

Страница 3: ...field wiring with suitable cross sectional areas that are approved for use at the maximum short circuit current of the PV module Yingli Solar recommends installers use only sunlight resistant cables...

Страница 4: ...not exceed an electrochemical potential difference of 0 5 Volts The frame rails have pre drilled holes marked with a grounding sign as illustrated in Figure 8 These holes should be used for grounding...

Страница 5: ...chment Figure 12 Installation rails The large size modules are mounted with four outer holes with max mechanical loads of 5400 Pa snow front and 2400 Pa wind back Top down Clamps Third party clamps th...

Страница 6: ...ve materials that could scratch or damage the glass surface Failure to comply with these requirements may adversely affect the PV module performance Yingli Solar PV modules are designed to withstand h...

Страница 7: ...1 2 xxx 405 430 YLxxxC 42e 1 2 xxx 450 480 Y L x x x C 4 2 e 1500V 1 2 xxx 450 480 YLxxxC 46e 1 2 xxx 495 525 Y L x x x C 4 6 e 1500V 1 2 xxx 495 525 YLxxxC 50e 1 2 xxx 540 575 Y L x x x C 5 0 e 1500V...

Страница 8: ...f 14 20 N m The tightening steps as follows use torque wrench to tighten nut to target torque nut loosen 90 180 degrees finally tighten the nut to the target torque and reduce the torque attenuation 2...

Страница 9: ...ashers of minimum 1 4 mm thickness with an minimum outer diameter of 15 57 mm Modules can be attached using the mounting holes the number of mounting holes used for a single long side frame 2 includin...

Страница 10: ...when it is pressed down L represents the length of the long side of the module the described distances are from the module edge to the middle of the clamp The long side frames of the module are fixed...

Страница 11: ...ules then remove the paper angles inside the box as shown in Figure 2 3 Cut the cardboard of one long side of the box then cut the inner packing belts around the modules and pallet as shown in Figure...

Страница 12: ...idth more than 1 5 m gantry can withstand more than 1 5 tons pressure The top of the gantry needs to be placed with cushioning material These transfer requirements apply to upright packaging modules N...

Отзывы: