Yingli Solar PANDA 108CELL 182TOPCon Скачать руководство пользователя страница 11

Note: If there are modules left after unpacking, please lay them flat and repack them.

Figure 5

Figure 4

Figure 3

Figure 2

Figure 1

Unpacking Instruction

s

 (for panels with a 

leng

th 

of

 2

278

 mm

 and less

)

1. C

ut the two longitudinal security straps, then carefully cut

and remove the cardboard of one short side of the box, as
showed in Figure 1. Pay attention to not damage the
modules during the cutting process.

2. C

ut  and  remove  the  inner  transverse  security  straps

around the modules, then remove the paper angles inside
the box,

 

as show

n

 in Figure 2.

3. C

ut the cardboard of one long side of the box , then cut

the inner packing-belts around the modules and pallet, as
show

n

 in Figure 3.

 

Pay attention to not damage the

modules during the cutting process.

4. S

lowly 

pull 

out the modules from the back side of the

module, as show

in Figure 4, then carry one module with

two people.

5. Do not place the package on a 

tilt angle 

of 

more than 17

degrees. When unpacking on 

a 

non-horizontal 

surface

,

measures 

must 

be 

taken 

to protect modules, as show

n

 in

Figure 5.

YINGLISOLAR.COM

©

 Yingli Energy Development Company Limited           

GB Modules Installation and User Manual  Page 1

1

 

Содержание PANDA 108CELL 182TOPCon

Страница 1: ...ication requirements has been verified by an independent certification laboratory This Installation and User Manual is available in different languages In cases of discrepancy between versions the Eng...

Страница 2: ...do not disassemble or modify Yingli Solar PV modules in any way Doing so may degrade performance or cause irreparable damage and will void any applicable warranties If it is necessary to store PV modu...

Страница 3: ...field wiring with suitable cross sectional areas that are approved for use at the maximum short circuit current of the PV module Yingli Solar recommends installers use only sunlight resistant cables...

Страница 4: ...not exceed an electrochemical potential difference of 0 5 Volts The frame rails have pre drilled holes marked with a grounding sign as illustrated in Figure 8 These holes should be used for grounding...

Страница 5: ...chment Figure 12 Installation rails The large size modules are mounted with four outer holes with max mechanical loads of 5400 Pa snow front and 2400 Pa wind back Top down Clamps Third party clamps th...

Страница 6: ...ve materials that could scratch or damage the glass surface Failure to comply with these requirements may adversely affect the PV module performance Yingli Solar PV modules are designed to withstand h...

Страница 7: ...1 2 xxx 405 430 YLxxxC 42e 1 2 xxx 450 480 Y L x x x C 4 2 e 1500V 1 2 xxx 450 480 YLxxxC 46e 1 2 xxx 495 525 Y L x x x C 4 6 e 1500V 1 2 xxx 495 525 YLxxxC 50e 1 2 xxx 540 575 Y L x x x C 5 0 e 1500V...

Страница 8: ...f 14 20 N m The tightening steps as follows use torque wrench to tighten nut to target torque nut loosen 90 180 degrees finally tighten the nut to the target torque and reduce the torque attenuation 2...

Страница 9: ...ashers of minimum 1 4 mm thickness with an minimum outer diameter of 15 57 mm Modules can be attached using the mounting holes the number of mounting holes used for a single long side frame 2 includin...

Страница 10: ...when it is pressed down L represents the length of the long side of the module the described distances are from the module edge to the middle of the clamp The long side frames of the module are fixed...

Страница 11: ...ules then remove the paper angles inside the box as shown in Figure 2 3 Cut the cardboard of one long side of the box then cut the inner packing belts around the modules and pallet as shown in Figure...

Страница 12: ...idth more than 1 5 m gantry can withstand more than 1 5 tons pressure The top of the gantry needs to be placed with cushioning material These transfer requirements apply to upright packaging modules N...

Отзывы: