7
Print test
The machine must be tested before printing for the first
time. The test content includes: Z-axis reset, switch light,
switch between Chinese and English interface.
First plug the power cord and turn on the AC power switch,
then turn on the switch diagram of the machine.
After the boot is completed, the interface is as shown.
(
Operation interface
)
(1)Z-axis movement
After the machine is powered on, click “Tools” on the touch
screen, click “Manual”, click on the map to move up or down. If
the machine can't move normally, turn off the power and
Содержание Panther
Страница 1: ...1 YIDIMU LCD 3D Printer User Manual ...
Страница 5: ...5 ...
Страница 6: ...6 Product Overview ...
Страница 11: ...11 Click Language Change Options ...
Страница 13: ...13 Click I Agree Select software installation location ...
Страница 14: ...14 Installation is complete choose whether to run the software immediately 1 2 Interface introduction ...
Страница 27: ...27 4 Fill fill structure selection of fill type inside the model such as mesh structure etc 5 Gcode ...
Страница 35: ...35 3 loading tray 4 Tighten the tray bracket fastening screws ...
Страница 36: ...36 5 Auto leveling 01 Place A4 paper on the LCD screen 02 Auto leveling ...