background image

 

 

TB200/400  Installation Guide 

 

8/11 

3.2.3 Power Connection 

Connect the power adapter to the Gateway’s power port, and then plug the power 

adapter into an electrical outlet. Press the On switch to power on the Gateway. The 

gatewaywill start booting. In the meantime, users would see that the “POWER” 

and “RUN” indicator lights turn on. 

Please switch off the power before plugging or unplugging the cables. 

3.2.4 Connection Diagram 

 

Figure 3-1 TB200/400 Connection Diagram (Front Panel)

 

 

 

Figure 3-2 TB200/400 Connection Diagram (Rear Panel) 

 

 

Содержание TB200

Страница 1: ...TB200 400 Installation Guide Version 1 0 Date April 20th 2015 Yeastar Information Technology Co Ltd...

Страница 2: ...nt 6 3 TB200 400 Installation 7 3 1 Placement Instructions 7 3 2 Installation Instructions 7 3 2 1 Connection of Ethernet Ports 7 3 2 2 Connection of BRI Ports 7 3 2 3 Power Connection 8 3 2 4 Connect...

Страница 3: ...ateway BRI VoIP VoIP BRI offering 2 or 4 BRI ports for companies using ISDN BRI lines an easy cost effective and flexible integration into any VoIP system or enabling any IP PBX to be connected to the...

Страница 4: ...f there is any problem please contact your provider Note please make sure the following devices are available before installation Sheet 1 TB200 400 Packing List Item Unit QTY Description TB200 400 PC...

Страница 5: ...the factory defaults Power status On The power is switched on Off The power is switched off System status Blinking The system is running properly Not Blinking Off The system goes wrong LAN port LAN p...

Страница 6: ...ch the device on or off Power Inlet For connection of power supply 2 2 Specifications and Operating Environment Table 2 3 TB200 400 Specifications and Operating Environment Items Description Size L W...

Страница 7: ...ent power junction box and effective anti grid interference measures have been taken Mechanical load Please make sure that the device is placed steadily to avoid any accident that might cause damage I...

Страница 8: ...l outlet Press the On switch to power on the Gateway The gatewaywill start booting In the meantime users would see that the POWER and RUN indicator lights turn on Please switch off the power before pl...

Страница 9: ...utton and then you can see the Web Configuration Panel login page see Figure 4 1 2 Enter the Admin User Name and Password to log in Figure 4 1 TB200 400 Web Configuration Panel Login Page Via the conf...

Страница 10: ...t 4 3 Make and Receive Calls 1 Calls from BRI to SIP Users should be able to receive BRI to SIP call after configuring a route on TB200 400 and an inbound route on SIP server if needed Please refer to...

Страница 11: ...uide only explains the installation and basic settings of TB200 400 BRI VoIP Gateways For more functionality and advanced settings please refer to the relative documents as below Yeastar TB BRI VoIP G...

Отзывы: