![Yeastar Technology TB200 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/yeastar-technology/tb200/tb200_installation-manual_3295690004.webp)
TB200/400 Installation Guide
4/11
1. Preparation before Installation
Contents of the Box
Upon receiving TB200/400 gift box, please open the package and check if all the
items are supplied as TB200/400 Packing List (See Sheet 1). If there is any problem,
please contact your provider.
Note: please make sure the following devices are available before installation:
Sheet 1 TB200/400 Packing List
Item
Unit
QTY
Description
TB200/400
PC
1
Device unit
Power cord
PC
1
For the input of 220V AC power
Network cable
PC
1
Mounting ears
PC
3
Long mounting ear: 1 PC; short mounting ear: 2
PCS
M3 Screw
PC
9
Warranty card
PC
1
With Serial Number printed for Repair & Return