Yealink  DECT  Phone  System  Deployment  Guide

 

The deployment procedure varies according to: 

 

Radio transmission and reception through the floors 

 

Similarities and differences between floors 

The study of transmission and reception through the floors determines whether several 
floors will be included in a same coverage area. There are two approaches in 
deploying a multiple storey building: 

 

If the degree of attenuation of the building construction materials (e.g., wood) of 
the building is low, deploy the base stations as follows: 

1.

 

Place the base station on an intermediate floor on the site. 

2.

 

Without moving the base station, go to the floor above, then measure the 
horizontal coverage at this location. 

3.

 

Without moving the base station, go to the floor directly below and measure 
the horizontal coverage at this location. 

4.

 

Arrange the base stations with one base station in the centre and the others 
surrounding it, as shown in the following diagram. 

 

 

If the degree of attenuation of the building construction materials (e.g., metal) of 
the building is high, follow the above introduced steps (single floor) to deploy each 
floor as individual parts. For more information, refer to 

Deployment in a Single Floor 

Building

 on page 

6

Note 

The similarities between the floors do not exclude variations in the radio transmission 
and reception. You are advised to check the sound quality on each floor. 

We recommend that you do not deploy base stations on the same vertical line. 

Содержание Telkom W52P

Страница 1: ......

Страница 2: ...nal quality Selecting a proper mounting location for base stations and repeaters Operating and configuring of the base station repeater and handset The following related documents for W52P IP DECT pho...

Страница 3: ...s and Site Density 5 Deployment Guidance 6 Deploying W52P DECT Phone System 6 Deployment in a Single Floor Building 6 Deployment in a Wider Single Floor Building 8 Deployment in a Multi Floor Building...

Страница 4: ...ding architecture and wall material Outside in free air radius 300m depending on reflections and surroundings Yealink DECT repeater RT10 is designed in accordance with DECT standard The RT10 repeater...

Страница 5: ...Construction materials such as walls floors ceilings Type of use such as for office hotel factory or store Dimensions Number of floors Height of floors Partitioning of floors The following table gives...

Страница 6: ...may exist where each group of users has mobility within their own system cell single base station coverage area As users have no mobility over the whole local site the phenomenon of increasing number...

Страница 7: ...t is a place that can be difficult for the radio signal to reach such as a corner of a room lifts and stairwells Determine the critical points for placing the deployment base stations 1 Select the fir...

Страница 8: ...s The final position is again the intersection point of the radio coverage cells indicated by the broken lines shown by position 6 in the following figure 5 Follow the above steps to locate area cente...

Страница 9: ...t Measure the radio coverage and determine the limit of the radio coverage of the critical point Measure the signal in a 45 degree angle towards the center of the area Proceed to the critical point P2...

Страница 10: ...the floor above then measure the horizontal coverage at this location 3 Without moving the base station go to the floor directly below and measure the horizontal coverage at this location 4 Arrange th...

Страница 11: ...ore user dense site The deployment process consists of the following steps Count the total number of users and associated traffic in the local site Define the homogeneous traffic areas Calculate the a...

Страница 12: ...o install the repeaters in series or daisy chain Repeater has the same radio coverage up to 300m in unobstructed outdoor areas and up to 50m inside buildings as the base station Repeater does not incr...

Страница 13: ...r within the base station coverage area The separation distance between the base station and repeater is 30m The base will hand over calls to the repeaters as the user moves from the base station cove...

Страница 14: ...ce from your handset follow these recommendations Keep the base station repeater away from steel constructions at least 4 feet 1 20 meters Do not place base station repeater directly on metallic surfa...

Страница 15: ...e devices is twice as large as the coverage at the rear The base stations should always be mounted higher that the obstructive objects in the area e g minimum higher than 2m above floor Repeaters shou...

Отзывы: