
n
In special use cases you should appoint special EMC actions.
–
Consider to wire all inductivities with erase links.
–
Please consider luminescent lamps can influence signal lines.
n
Create a homogeneous reference potential and ground all electrical operating sup-
plies when possible.
–
Please take care for the targeted employment of the grounding actions. The
grounding of the PLC serves for protection and functionality activity.
–
Connect installation parts and cabinets with your PLC in star topology with the
isolation/protected earth conductor system. So you avoid ground loops.
–
If there are potential differences between installation parts and cabinets, lay suffi-
ciently dimensioned potential compensation lines.
HMI
Industrial Security and Installation guidelines
Installation guidelines > Basic rules for the EMC-equitable assembly of installations
HB160 | PPC | 67K-RRJ0 | en | 22-20
65
Содержание PPC010 EC
Страница 1: ...PPC 67K RRJ0 Manual HB160 PPC 67K RRJ0 en 22 20 HMI Panel PC PPC010 EC...
Страница 14: ...HMI Hardware description Structure Interfaces HB160 PPC 67K RRJ0 en 22 20 14...
Страница 58: ...4 7 Save and Exit HMI BIOS setup Save and Exit HB160 PPC 67K RRJ0 en 22 20 58...
Страница 72: ...Appendix HMI Appendix HB160 PPC 67K RRJ0 en 22 20 72...
Страница 73: ...Content A History of changes 74 HMI Appendix HB160 PPC 67K RRJ0 en 22 20 73...