Installation
4
-
18
4.3
Installation example
1. At the first set out, anchor the base plate firmly onto the floor.
2. The robot base is tapped for 4 mounting holes. Fix the robot base with the screws M10
(strength class 12.9) Minimum length: 35 mm.
3. Next, fix the robot base to the base plate. Tighten the hexagon head bolts and anchor
bolts securely so that they will not work loose during operation (see figure „Mounting of
the robot on the base plate“).
Fig. 4-1: Mounting the robot on the base plate
Screws
Anchor bolt (M10 or greater)
Washer
Hole Ø 6
H7
Robot base
4 mounting holes Ø 12
Base plate
Holes Ø 12
H7
at least 20 mm
adhesive
194
105
r
0,05
100
92
r
0,1
92
r
0,1
66
r
0,1
r
0,1
85
r
0,05
100
r
0,1
66
r
0,1
60
160
50
50
160
4
7
1
2
3
4
5
4
6
10
9
8
1
6
2
7
3
8
4
9
5
10
Содержание MH5S II
Страница 1: ...ROBOTICS MH5S II YR MH0005S J12 Operating and Maintenance Manual...
Страница 19: ...Installation 4 19 Fig 4 2 Base plate 3 160 30 4x 80 350 350 290 290 160 18 50 4x 20 24 4...
Страница 32: ...Technical data 6 32 Robot speed degrees second deg s Definitions Description...
Страница 47: ...Maintenance and inspection 9 47 Fig 9 2 Inspection intervals 5 5 5 7 1 1 1 1 1 6 1 3...
Страница 73: ...Parts lists 11 73 Tab 11 1 S axis drive 1049 HW0414484 1 Gasket 1 No DWG no Designation Piece...
Страница 82: ...YASKAWA Headquarter...