Page 17
6a
6b
6c
6d
6e
7
8
POWER ON
Before closing the cover of
inverter wire-box, check again
that the gateway’s power
switch is set to on.
Pass the cable through the
disassembled cable gland
parts in sequence, then tighten
the cable glands again.
Screw one end of the antenna
cable into the cable connector
of the gateway.
Screw the other end of the antenna cable into the antenna.
Содержание ENC-G5
Страница 1: ...Quick Guide for ENC G5 09 22 2022 Revision 1 ...
Страница 7: ...Page 6 Dimensions and Interfaces ...