
8
S6
Step 4- Layout Posts and
Connectors
Fig. 1
Fig. 2 - Attach Post Top Connectors
with S6- 1 1/2” Pan Head Screws.
1. Layout Arbour bases in confi guration shown in fi gure 1.
*Arbour bases must be secured on
a fl at and level surface. It is recommended the structure be secured to existing stone,
concrete or deck with the Yardistry Post Base (YM21016) or equivalent hardware.
2. Install Post Top Connectors with S6- 1 1/2” Pan Head Screws provided. (Fig. 2) Ensure the
direction of the Post Top Connector is the same direction as indicated by the arrows in fi gure 1.
Install on a fl at
and level surface!
16x
1 1/2” Pan head Screws
4x - Post Top Connector