background image

YARDGARD SELECT

 

- FENCE FRAMEWORK INSTALLATION INSTRUCTIONS 

PAGE 5

PAGE 4  

 

YARDGARD SELECT

 

- FENCE FRAMEWORK INSTALLATION INSTRUCTIONS

STAGE 1: FRAMEWORK INSTALLATION

1

STEP 3:

 

INSTALLING POSTS

IMPORTANT

 Before installing hardware, make sure your 

posts are completely set. A cordless drill is required to install self-

tapping screws . 

•  Slide a tension band over each end post and gate post. Slide 

two tension bands perpendicular to one another over each 

corner post (bottom of Fig. 7). Do not tighten the tension 

bands until STAGE 2 . Install post cap .

•  Remove rail connector cup from the rail connector base by 

loosening and removing nut and washer. (Fig. 8a) 

•  Install rail connector base to top of each post with self-tapping 

screws . (Fig . 8b) 

TIP

 Pre-drilling holes to install rail connector cup is suggested.

•  Reconnect the rail connector cup back to base (Fig. 8c). 
•  Each end and gate post will require three Panel-to-Post Brackets. 

Install the first Panel-to-Post Bracket 1

˝

 below the rail connec

-

tor base with self-tapping screws (Fig. 7a). 

• 

ALWAYS

 install the Panel-to-Post Brackets with the flat side 

facing outward. 

•  Install the second bracket 20

˝

 below the first one (center-to-center). 

Install the third bracket 20

˝

 below the second one (Fig. 7a). 

•  Each corner post will require six Panel-to-Post Brackets. See 

Fig. 7b for location and placement of brackets.

 

Base Bolt

Cup Washer

Nut

Base Bolt Cup

Nut

Washer

Self-Tapping Screw

Post

(Top View)

Post

(Side View)

Post

(Front View)

Flush rail connector base with top of post

Base Bolt

Cup Washer

Nut

Base Bolt Cup

Nut

Washer

Self-Tapping Screw

Post

(Top View)

Post

(Side View)

Post

(Front View)

Flush rail connector base with top of post

Base Bolt

Cup Washer

Nut

Base Bolt Cup

Nut

Washer

Self-Tapping Screw

Post

(Top View)

Post

(Side View)

Post

(Front View)

Flush rail connector base with top of post

Panel-to-Post

Bracket

Facing Side

(Facing Outward)

20˝

20˝

20˝

20˝

Tension Band

Tension Band

Fig . 7  Hardware Installation

Fig . 7a

END

/

GATE Post

END

/

GATE Post

Fig . 7b

CORNER Post

CORNER Post

IMPORTANT: 

Insert tension bands before installing 

Panel-to-Post Brackets and Rail Connectors. 

STAGE 1: FRAMEWORK INSTALLATION

1

STEP 4:

 

INSTALLING TOP RAIL

IMPORTANT

 ALWAYS

 install the top rail with the flat side  

facing outward.
•  Insert top rail into rail connector cup. Fasten the rail to the cup 

with a  self-tapping screw inserted from the curved side (Fig. 9).

•  Position the first section of top rail over line posts. To connect 

the next section of top rail, insert a rail sleeve over the top rail. 

Insert the next section of top rail into the opposite end of the 

rail sleeve. 

•  Fasten rail sleeves to top rails with self-tapping screws (Fig. 9). 

DO NOT fasten the rails to the line posts. If rail sleeve happens to 

be lined up with a line post, DO NOT fasten the rail sleeve at this 

point. DO NOT fasten rail sleeve for the terminating section at 

this time.

•  Follow this same process until you reach the terminating section 

of your fence line. 

•  Measure the last section of top rail from the rail sleeve (3˝ in) 

to the back of the rail connector cup (Fig. 10).

•  Follow the numeric sequence in Fig. 11 to connect the terminating 

top rail to the post.

•  After the terminating section is in place, fasten the rail sleeve for 

the terminating section.

•  DO NOT fasten the top rail to the line posts at this time. This will 

be done in Stage 2 after the fence panels are inserted. 

•  Repeat the same process for each fence line.

Fig . 9

Fig . 10  Proper Length Measurement

 
IMPORTANT: Always measure from the inner wall of Rail 

Connector Cup to 3˝ inside of top rail sleeve.

Fig . 11  Inserting the Terminating Top Rail 

Facing Side 

with Flat Surface
(Facing Outward)

Top Rail Sleeve

Top Rail

Top Rail

Rail Connector 
Cup

Rail Connector Cup

Self-Tapping

Screw

Line Post

End/Corner 

Post

POST

Top Rail Sleeve

Middle Stop

Top Rail

Top Rail

Cut Off

PROPER LENGTH

From back of rail connector cup 

to 3˝ inside of the top rail sleeve.

Rail Connector 

Cup

3"

POST

POST

Top Rail Sleeve

Fit Rail Connector Cup to 

the terminating Top Rail

Top Rail

Terminating Top Rail

Insert terminating top rail as far 

as possible into top rail sleeve

Slide terminating top rail and 

rail connector cup to the 

rail connector base

Lower the whole top rail assembly

Lift top rail up

Top Rail Sleeve

Top Rail

Fasten the nut

Fig . 8 Rail Connector Assembly

8a

8c

8b

Pull Down 

to Lock

Facing Side

with Flat Surface

(Facing Outward)

Top

Rail

Содержание YARDGARD-FK

Страница 1: ...op Rail 5 STAGE 2 FENCE PANEL INSTALLATION 6 Tools and Materials 6 Fence Panels Parts List 6 Step 1 Installing Tension Wire 7 Step 2 Installing Fence Panels 8 STAGE 3 GATE INSTALLATION 9 Tools and Mat...

Страница 2: ...ody protections such as knee pads work gloves etc are also suggested Use your YARDGARD SELECT Planning Purchasing Guide to assist with your installation process Before you begin visit homedepot com or...

Страница 3: ...3 Leveling Soil Surface for Adjusting Concrete Footings Fig 4 6 50 22 Post Hole Ground Ground Line Post Ground Crown If the ground is too LOW If the ground is too HIGH Level 48 Width 50 From Ground Le...

Страница 4: ...P 4 INSTALLING TOP RAIL IMPORTANT ALWAYS install the top rail with the flat side facing outward Insert top rail into rail connector cup Fasten the rail to the cup with a self tapping screw inserted fr...

Страница 5: ...ension band 3 from the ground Fig 12 Attach the tension wire ratchet included in the Post Hardware Kit to the tension band and tighten carriage bolt using an adjustable wrench Fig 12 Duplicate this st...

Страница 6: ...the curved side Attach tension wire to fence panels with panel to wire clip using adjustable pliers Attach one clip every 2 1 2 3 Near center of each mesh panel Inside of each rail connector cup In b...

Страница 7: ...op GATE Hinge Top POST Hinge Self Closing GATE Hinge Self Closing POST Hinge Gate Frame Post Gate Latch PVC Post Protector Hinge Post Latch Post Instrucciones de instalaci n del YARDGARD SELECT 2014 M...

Страница 8: ...or para postes Pala Cubeta para mezclar Concreto de fraguado r pido 1 saco de 50 lb por poste Cinta m trica Cordel Estacas Nivel PRIMEROS PASOS HERRAMIENTAS Y MATERIALES Cada secci n tendr una lista d...

Страница 9: ...fundidad Fig 2 Marque una l nea de terreno en la parte de abajo de cada poste a 50 pulgadas de su parte superior Fig 1 Si est realizando la instalaci n en terreno sumamente desigual o pasto grueso mar...

Страница 10: ...uste la copa del conector de travesa o en el travesa o terminal superior Suba el travesa o superior Travesa o superior Manga del travesa o superior POSTE POSTE Travesa o terminal superior Inserte el t...

Страница 11: ...y 14 Estire el alambre tensor hasta el trinquete para alambre tensor ubicado en el extremo opuesto de la l nea de la valla Repita los pasos anteriores y rote hasta que el alambre est tenso Repita el p...

Страница 12: ...ortar el panel en el alambre vertical m s cercano utilizando el cortador de alambre Voltee el panel de manera que el panel corto se conecte a tres clips de poste a panel Conecte las dos secciones de p...

Страница 13: ...isagras Fig 19 Instale la bisagra de port n de cierre autom tico sin apretarla en el armaz n del port n aproximadamente a 7 pulgadas de la parte inferior del port n Fig 19 Alinee el port n coloc ndolo...

Отзывы: