background image

RMB/ENERGIE GmbH | 5

Safety information

Manual neoTower

®

 Power Storage | (02/2022)

2.  Safety information

 

2.1  Intended use 

The unit is a battery power storage system which can 

boost coverage of the building’s power consumption. 

With this system the surplus generated electricity is 

stored in high-quality, modern batteries.

The system may only be used if it is in perfect 

technical condition and has been commissioned by the 

manufacturer or by a specialist partner authorised by 

the manufacturer.

Intended use also includes reading and complying with 

the instructions in this manual.

Any other use is considered to be contrary to the 

intended use. 

2.2  Authorised target groups 

This manual is intended for different target groups that 

are authorised for specific assignments.

2.2.1  Manufacturer

The manufacturer supplies the product and has the 

following responsibilities:

 

Training of technicians for assembly, maintenance, 

disassembly and disposal.

 

Commissioning of the system.

Only the manufacturer has access to the "Expert" area 

in the "RMB/Control".

2.2.2  Operator

The operator is responsible for the building in which 

the product is used. The operator has the following 

responsibilities:

 

Compliance with requirements by the energy 

supplier (e.g. registration, licensing, remuneration).

 

Compliance with the installation site requirements.

 

Induction of users.

 

Compliance with legal occupational safety 

regulations.

 

Compliance with applicable safety, accident 

prevention and environmental protection 

regulations.

 

Provision and observance of documentation.

 

Ensuring that the product is always in a technically 

perfect condition.

 

If necessary, storage of the system.

2.2.3  Technician

Technicians are responsible for the assembly, 

maintenance, disassembly and disposal of the product. 

The following points must be observed:

 

Work may only be carried out by qualified personnel 

who have been trained by the manufacturer and 

are familiar with installation engineering, gas and 

water installations as well as the applicable safety 

regulations. 

 

Special work during installation (e.g. work involving 

the building’s structure or the ventilation system) 

may only be carried out by appropriately qualified 

personnel from specialist companies.

 

Electrical installations may only be carried out by 

qualified electricians.

Only skilled personnel who have been trained by the 

manufacturer have access to the "Technician" area in 

the "RMB/Control".

2.2.4  User

Users are permitted to carry out certain operational and 

cleaning tasks. User requirements:

 

Users must be trained by the operator on the 

product.

 

They must be familiar with the instructions in this 

manual.

Authorised users have access to the unprotected 

areas in the "RMB/Control", but not to the "Expert" and 

"Technician" areas.

Содержание RMB Energie neoTower BSS 7

Страница 1: ...MANUAL neoTower Power storage Valid as of 02 2022 ...

Страница 2: ...ery modules 7 3 Product information 8 3 1 Principle of operation 8 3 2 Registration with the energy supplier 8 3 3 Product versions 8 3 4 Scope of delivery 9 3 5 Dimensions 9 4 Installation and commissioning 10 4 1 Installation site requirements 10 4 2 Placement 10 4 3 Connection 10 5 Display and operation 14 5 1 Inverter LED display 14 5 2 Charger LED display 15 5 3 Battery module operation 17 5 ...

Страница 3: ...s Battery storage system BSS BSS 7 BSS 11 BSS 21 Blackout start BOS BOS 18 BOS 21 BOS 36 BOS 57 BOS 114 This manual is protected by copyright Reproduction reprinting and distribution is only permitted with the consent of the manufacturer Subject to change without notice 1 2 Supplementary information The following supplementary information and documents are available at www rmbenergie com Technical...

Страница 4: ...n highlighted with the word CAUTION indicates a situation that can cause slight or moderate injury ATTENTION Information highlighted with the word ATTENTION indicates a situation that can cause damage to property or the environment 1 4 Explanation of symbols Texts Required action List D Reference to other places in this document Reference to other documents that must be observed Web link Illustrat...

Страница 5: ...ration Compliance with the installation site requirements Induction of users Compliance with legal occupational safety regulations Compliance with applicable safety accident prevention and environmental protection regulations Provision and observance of documentation Ensuring that the product is always in a technically perfect condition If necessary storage of the system 2 2 3 Technician Technicia...

Страница 6: ...cations have been made to the system If protective devices are non functional or missing During the construction phase of the building After storage of the system for more than 6 months after delivery After decommissioning of the system for more than 6 months By children or persons who cannot assess hazards when handling the system In the following cases the manufacturer does not assume any liabil...

Страница 7: ...th liquid cleaning agents 2 5 Protective devices WARNING The protective devices serve to ensure safety when handling the system Missing or defective protective devices can result in hazardous situations Make sure that protective devices are not removed Observe the safety instructions on the individual components of the system 2 6 Handling the battery modules WARNING The battery modules that are co...

Страница 8: ...lliseconds ensuring uninterrupted operation of the electronic devices The systems are of modular design and can be calculated for the required storage capacity 3 2 Registration with the energy supplier The energy supplier must be notified when the system is installed Operator requirements Inform yourself of any relevant requirements Notify the energy supplier before installing the system Meet the ...

Страница 9: ... delivery may vary depending on the system size Figure neoTower BOS 21 power storage A Battery B Battery connection set RED BLACK C Patch cable D Grounding cable E Inverter F Documentation 3 5 Dimensions Figure System cabinet System cabinet L mm W mm H mm BSS 7 11 21 BOS 18 21 36 600 600 2 000 BOS 57 114 800 800 2 000 H L B ...

Страница 10: ...stance at the top of the unit 10 cm min Distance at the side of the unit 10 cm min Distance below the unit Determined by the unit supports 4 2 Placement The battery storage system can be installed if the requirements listed in 4 1 are met Remove the packaging material Check the system for the components listed in the scope of delivery Remove the Euro pallet and position the system at the intended ...

Страница 11: ...torage 02 2022 Make the following settings value table for the BSS on the screen of the CHP unit neoTower Min SoC unless there is a power failure Power specifications mains network supply BSS 7 BSS 11 BSS 21 BSS 7 BSS 11 BSS 21 2 0 min 10 max 100 As a rule 0W 3 3 4 0 5 0 7 2 ...

Страница 12: ...lue table for the BOS on the screen of the CHP unit neoTower Min SoC unless there is a power failure Max SoC for release of the CHP standalone operation BOS 18 BOS 21 BOS 36 BOS 57 BOS 114 BOS 18 BOS 21 BOS 36 BOS 57 BOS 114 BOS 114 2 0 min 10 max 100 min 20 max 80 3 3 4 0 5 0 7 2 9 5 11 0 12 5 16 0 20 0 25 0 30 0 50 0 ...

Страница 13: ...OS 114 2 0 800 W n a n a n a n a As a rule 0W 3 3 max inverter as starter max inverter as starter max inverter as starter max inverter as starter max inverter as starter 4 0 5 0 n a n a n a 7 2 9 5 max inverter as starter max inverter as starter max inverter as starter max inverter as starter 11 0 n a n a 12 5 max inverter as starter max inverter as starter max inverter as starter 16 0 n a n a 20 ...

Страница 14: ...in operation and current is flowing to the consumers The rated power of the device has been exceeded The overload indicator is flashing The inverter is switched off due to overload or short circuit The battery is almost empty The inverter is switched off as the battery voltage level is too low The device temperature has reached a critical value ...

Страница 15: ...the battery connection is too high The inverter is switched off as the ripple voltage on the battery connection is too high The AC voltage at input AC in 1 or AC in 2 is connected through and the charger is in constant current mode bulk The AC voltage at input AC in 1 or AC in 2 is connected through The device is charging but the set absorption voltage has not yet been reached battery protection m...

Страница 16: ... the missing current The AC voltage at the input AC in 1 or AC in 2 is connected through and the charger is in voltage maintenance or storage mode float or storage The AC voltage at the input AC in 1 or AC in 2 is connected through and the charger is in equalisation mode The AC voltage at input AC in 1 or AC in 2 is connected through The input AC current corresponds to the applied load The charger...

Страница 17: ...pprox 1 2 seconds to start the top master battery The remaining batteries automatically start in succession RUN LED C Illuminated LED indicates the battery is in operating mode ALM LED D Flashing LED indicates a battery error message An illuminated battery indicates that the protection mechanism has tripped Status LEDs E 6 status LEDs show the current charging status of the battery A B C D E ...

Страница 18: ...uring mains operation in set value In parallel mains operation the value does not fall below this set limit This ensures a necessary minimum runtime that the BOS system can bridge Switch Currently set operating mode in plain text Status Status display of the inverters in plain text Temperature alarm Display alarm in the event of overtemperature Low battery alarm Alarm display when the batteries ar...

Страница 19: ...abled Display for overall release for CHP start up in standalone mode all the above releases must be enabled Power specifications mains network supply Specification of how many watts are to be permanently supplied to the mains network or taken from the mains network set value in watts Power L1 L2 L3 Display of the current power on the mains side in watts Current L1 L2 L3 Display of the present cur...

Страница 20: ...talled in the power storage system is not necessary Every two weeks Check the system to ensure that no errors are signalled Every six months Check for any changes to the state of charge 6 2 Cleaning ATTENTION Damage to the equipment caused by scratched surfaces and or internal damage due to ingress of water Do not use abrasive cloths sponges or cleaning agents Do not use a water jet Carefully clea...

Страница 21: ...ENTION Improper transport of the battery modules Battery module fire or leakage of hazardous substances Only transport the battery modules in packaging that complies with the applicable regulations Never transport damaged battery modules under any circumstances NEVER dispose of the power storage system with the components it contains with the household waste Dispose of the storage system and the b...

Страница 22: ...abinet LxWxH mm Manufacturer Power kW 3 5 10 Manufacturer Gross capacity 2x 3552 Wh 74 Ah 3x 3552 Wh 74 Ah 6x 3552 Wh 74 Ah Operating voltage V 48 48 48 Cell type LiFePo4 LiFePo4 LiFePo4 Efficiency 90 95 90 95 90 95 Safety Emissions 1 The cabinets must always be positioned side by side Deviating values depending on ambient and operating conditions Subject to technical modifications design variatio...

Страница 23: ...facturer Power kW 9 15 24 45 90 Manufacturer Gross capacity 5x3552 Wh 74 Ah 6x3552 Wh 74 Ah 10x3552 Wh 74 Ah 16x3552 Wh 74 Ah 32x3552 Wh 74 Ah Operating voltage V Cell type Efficiency Safety Emissions 1 Applies to systems built in 2022 or later Testing by the manufacturer required 2 The cabinets must always be positioned side by side Deviating values depending on ambient and operating conditions S...

Страница 24: ...RMB ENERGIE GmbH Hauptstrasse 543a 26683 Saterland Germany Tel 49 4498 92288 0 Fax 49 4498 92288 66 info rmbenergie com www rmbenergie com ...

Отзывы: