22 | RMB/ENERGIE GmbH
assembly
Operation manual CHP 5.0 - 30.0 | Status 01.2020
Expansion tank
A
Before connecting, ensure that the system pressure
of the expansion tank connection block is 1.0 bar.
A
Connect the line to the “expansion tank” connection
on the generation unit.
A
Connect the line to the expansion tank connection
block.
Condensate
The line for the condensate water must be corrosion
resistant.
The line must have a sufficient gradient between the
generation unit and the drain.
A
Connect the line to the “Condensate” connection on
the generation unit.
A
Connect the line to the condensate drain.
Flue gas
The line must be laid with a sufficient gradient to the
generation unit.
A
Make sure that a suitable flue gas silencer
(optionally available) is present:
B
In the flue gas routing.
B
In close proximity to the generation unit.
B
With horizontal installation with correct discharge
of the condensate water.
A
Connect the line to the “flue gas” connection on the
generation unit.
A
Connect the line to the flue.
A
Ensure that the line is not interrupted (e.g. that it
does not slip out of vertically installed parts).
A
Ensure that the flue gas guide cannot come loose
from the connecting piece due to vibrations.
Flue gas silencer instructions.
Planning and assembly instructions flue gas/
exhaust air.