5.2.2 Installation room
The installation room must meet the following
requirements:
B
The installation room must comply with the effective
applicable laws and regulations for boiler rooms
(e.g. in Germany, the ordinance for heat-producing
appliances (Feuerstättenverordnung)).
B
The substrate on which the generation unit is to
be installed must be flat, even, solid, dry and load-
bearing.
B
The ambient air temperature must be between
+5 °C and +30 °C.
B
The room height must be at least 2,400 mm from
the installation surface.
B
The system must be protected against frost and the
elements.
The following are not permitted:
B
Installation on floating screed.
B
Operation of tumble dryers in the same room.
B
Storage of explosive or highly flammable materials
(e.g. paper, paints, petrol) within the installation
location.
B
Use of aggressive substances (e.g. sprays,
solvents, chlorinated cleaning agents, paints,
adhesives) in the vicinity of the system.
If the system is installed in vaulted cellars or bare
smooth-walled rooms (hard-walled), there is a risk of
noise and sound resonance.
The system must be positioned so that the following
requirements are fulfilled:
B
None of the system’s ventilation or extraction
devices may be blocked or closed.
B
The emergency stop switch must always be
accessible.
Space requirement CHP 5.0 - 7.2
> 1000
> 1000
> 1000
> 1000
1226
1097
635
Space requirement CHP 11.0 - 20.0
1480
> 1000
> 1000
> 1000
> 1000
1097
643
1233
708
Space requirement 25.0 - 30.0
> 1000
> 1000
> 1000
> 1000
1659
1400
781
The minimum clearance to the generation unit
(> 1,000 mm on all sides) must be maintained.
Minimum distance for maintenance work:
B
700 mm free space above the system.
B
300 mm free space next to the control cabinet.
If the minimum distances are not maintained:
A
Contact the manufacturer.