background image

11

Warranty conditions:

Inspection Certificate

Warranty Card

Number:

Number:

Name

Tell

Mailing address

Purchase time

Bill

number

Product number

Fuselage

number

Replacement

parts

Date

Fault description:

1. Withinthedateofpurchase,themotorisguaranteedforoneyear(ifitismorethan7daysfromthedateof

purchase, no replacement, only warranty).
2. Before using the equipment, you must understand the instructions and safety instructions.

3. During the warranty period, the artificial damage of warranty accessories will not be guaranteed.
4. During the warranty period, users who do not follow the operation instructions or dismantle and repair by

themselves will not be guaranteed. (if repair is needed, the cost of production will be charged)

5. The buyer shall take the invoice to the place designated by the seller for repair, or send the machine back to our

company for repair. (return freight, insurance paid by yourself)

Model

Motor

Accessories

Power cable

Switch

Shell

Suction

Control

Fuselage

Function

Manual

Package

Содержание YZ-X1

Страница 1: ...YZ X1 FLOOR SCRUBBER Operating instruction ANHUI YANGZI INDUSTRIAL TECHNOLOGY CO LTD...

Страница 2: ...YZ X1 Instruction Manual 1...

Страница 3: ...2 Catalogue 1 0 Operationsafety instruction 01 2 1 Functions and precautions 02 2 2 Features and parameters 03 3 0 For the first time to use 04 4 0 Daily operation and maintenance 05...

Страница 4: ...ndanger persons or cause serious damage to property Safety Precautions Attempttooperateorrepairthemachinewithoutreadingthisinstructionmanualmay cause harm to you or others Capable of damaging machiner...

Страница 5: ...ld use a three core power cord with a ground wire and a power supply In order to avoid electric shock accidents to the maximum extent please install a leakage circuit breaker Don t put anything on the...

Страница 6: ...round will completely dry water 3 The equipment is designed for use on flat ground Do not operate or operate on inclined surface Avoidance of danger 4 The equipment should be stored and parked horizon...

Страница 7: ...altotheinstallationandremovalof batteries The suction motor is installed on the cover of the sewage tank After the sewage tank cover is turned over the water absorption motor can be easily repaired 4...

Страница 8: ...ter tank 6 Putthebrushplateon putdownthewater absorbingsteakandbrushplate 7 Start suction motor brush motor and solenoid valve 8 Openthehandleofthewatervalveswitchtoadjusttheappropriatewateroutput 9 T...

Страница 9: ...handle and control thewaterflow Itcanbothcleanthefloorandreducethewearandtearofcleanwater detergent 6 starttheswitch brushmotor solenoidvalveopen themachinestartstowork Note Theadjustmentofwaterabsorp...

Страница 10: ...ushheadandthebrush platebayonetarebasicallyaligned andpressdownthecontrolsurfaceatthistime Brushplatemotorstartbutton thebrushplatewillbeinstalledautomaticallywiththe rotationofthemotor andthen youcan...

Страница 11: ...l pleasepurchase the specialoil resistant rubber strip 12 Work at the end of each day 1 Clean the outside of the cleaning machine with dry and wet cloth 2 the sewage tank in the sewage empty and clean...

Страница 12: ...tructions and safety instructions 3 Duringthewarrantyperiod theartificialdamageofwarrantyaccessorieswillnotbeguaranteed 4 During the warranty period users who do not follow the operation instructions...

Отзывы: