7
2. Before operating the unit
Installation procedures
・
precautions
(1)
Select an installation site.
・
Make sure that all of four legs are securely on a flat surface.
(2)
Install shelf boards.
・
The lowest shelf board has been secured with screws at the time of shipping from the
factory.
・
Install shelf pegs at heights you want on the right and left shelf posts in the internal bath of
the main body.
・
Completely push shelf boards by sliding to the end.
*Take care to put each shelf board on correct pairs of right and left shelf pegs.
・
Make sure that shelf boards will not fall nor rattle.
・
Withstand load of each shelf board is 15 kg in even loading.
When putting samples,
arrange them as dispersed as possible.
Shelf pillar
Screw
Screw
Shelf board
Flow
adjusting
plate
Clamp
Shelf board
Sample
15 kg
Содержание DKM300C
Страница 44: ...42 ...