ENGINE
3-15
3. Check:
• Air filter element
Damage
→
Replace.
NOTE:
• Replace the air filter element every 40000
km (2400 mi) of operation.
• The air filter needs more frequent service if
you are riding in unusually wet or dusty
areas.
4. Install:
• Air filter element
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a. Insert the air filter projections “1” “2” into
the part of the air filter case “3”.
b. Fold the air filter “1” forward and then fit into
the air filter case.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
CAUTION:
EC2C01007
Never operate the engine without the air fil-
ter element installed. Unfiltered air will
cause rapid wear of engine parts and may
damage the engine. Operating the engine
without the air filter element will also affect
the throttle body synchronization, leading
to poor engine performance and possible
overheating.
NOTE:
When installing the air filter element into the
lower air filter case, make sure that the sealing
surfaces are aligned to prevent any air leaks.
5. Install:
• Upper air filter case
Refer to “AIR FILTER CASE” on page 7-
4.
• Fuel tank
Refer to “FUEL TANK” on page 7-1.
• Rider seat
Refer to “GENERAL CHASSIS” on page
4-1.
EAS21010
CHECKING THE THROTTLE BODY JOINTS
The following procedure applies to all of the
throttle body joints and intake manifolds.
1. Remove:
• Rider seat
Refer to “GENERAL CHASSIS” on page
4-1.
• Fuel tank
Refer to “FUEL TANK” on page 7-1.
• Air filter case
Refer to “AIR FILTER CASE” on page 7-
4.
• Throttle body
Refer to “THROTTLE BODIES” on page
7-9.
2. Check:
• Throttle body joints “1”
Cracks/damage
→
Replace.
1
1
2
3
1
1
Содержание YZFR6X(C) 2008
Страница 1: ...SERVICE MANUAL YZFR6X C 13S 28197 10 LIT 11616 21 61 2008 ...
Страница 6: ......
Страница 8: ......
Страница 57: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 26 ...
Страница 60: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 EAS20410 LUBRICATION DIAGRAMS 1 2 3 4 ...
Страница 62: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 1 2 3 4 8 7 6 5 ...
Страница 64: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 1 2 3 4 5 ...
Страница 65: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 34 1 Oil cooler 2 Oil filter 3 Oil pipe 4 Oil pump 5 Oil strainer ...
Страница 66: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 1 5 4 3 2 ...
Страница 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 3 1 2 5 4 ...
Страница 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 1 3 2 ...
Страница 71: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 40 1 Oil pipe 2 Main axle 3 Drive axle ...
Страница 72: ...COOLING SYSTEM DIAGRAMS 2 41 EAS20420 COOLING SYSTEM DIAGRAMS 1 2 3 4 ...
Страница 73: ...COOLING SYSTEM DIAGRAMS 2 42 1 Radiator inlet hose 2 Radiator inlet pipe 3 Thermostat outlet hose 4 Radiator ...
Страница 74: ...COOLING SYSTEM DIAGRAMS 2 43 A A 2 1 3 4 5 6 7 8 6 13 8 9 15 14 9 10 11 12 ...
Страница 76: ...CABLE ROUTING 2 45 EAS20430 CABLE ROUTING ...
Страница 78: ...CABLE ROUTING 2 47 60 20 AA BB CC E E B D D B A A C C C ...
Страница 80: ...CABLE ROUTING 2 49 ...
Страница 82: ...CABLE ROUTING 2 51 ...
Страница 84: ...CABLE ROUTING 2 53 ...
Страница 86: ...CABLE ROUTING 2 55 ...
Страница 88: ...CABLE ROUTING 2 57 ...
Страница 90: ...CABLE ROUTING 2 59 A A ...
Страница 92: ...CABLE ROUTING 2 61 ...
Страница 95: ......
Страница 135: ......
Страница 206: ...CHAIN DRIVE 4 71 1 2 3 a a New ...
Страница 209: ......
Страница 240: ...PICKUP ROTOR 5 31 ...
Страница 286: ...TRANSMISSION 5 77 ...
Страница 290: ...RADIATOR 6 3 b Apply 100 kPa 14 50 psi 1 0 kg cm2 of pressure c Measure the indicated pressure with the gauge ...
Страница 300: ...WATER PUMP 6 13 ...
Страница 316: ...AIR INDUCTION SYSTEM 7 15 EAS27040 AIR INDUCTION SYSTEM 2 1 2 4 3 4 3 6 4 5 A A ...
Страница 323: ......
Страница 324: ...IGNITION SYSTEM 8 1 EAS27090 IGNITION SYSTEM EAS27110 CIRCUIT DIAGRAM ...
Страница 330: ...ELECTRIC STARTING SYSTEM 8 7 EAS27160 ELECTRIC STARTING SYSTEM EAS27170 CIRCUIT DIAGRAM ...
Страница 336: ...CHARGING SYSTEM 8 13 EAS27200 CHARGING SYSTEM EAS27210 CIRCUIT DIAGRAM ...
Страница 337: ...CHARGING SYSTEM 8 14 1 AC magneto 2 Rectifier regulator 6 Main fuse 7 Battery 11 Engine ground ...
Страница 339: ...CHARGING SYSTEM 8 16 ...
Страница 340: ...LIGHTING SYSTEM 8 17 EAS27240 LIGHTING SYSTEM EAS27250 CIRCUIT DIAGRAM ...
Страница 344: ...SIGNALING SYSTEM 8 21 EAS27270 SIGNALING SYSTEM EAS27280 CIRCUIT DIAGRAM ...
Страница 351: ...SIGNALING SYSTEM 8 28 ...
Страница 352: ...COOLING SYSTEM 8 29 EAS27300 COOLING SYSTEM EAS27310 CIRCUIT DIAGRAM ...
Страница 355: ...COOLING SYSTEM 8 32 ...
Страница 356: ...FUEL INJECTION SYSTEM 8 33 EAS27330 FUEL INJECTION SYSTEM EAS27340 CIRCUIT DIAGRAM ...
Страница 395: ...FUEL INJECTION SYSTEM 8 72 ...
Страница 396: ...FUEL PUMP SYSTEM 8 73 EAS27550 FUEL PUMP SYSTEM EAS27560 CIRCUIT DIAGRAM ...
Страница 399: ...FUEL PUMP SYSTEM 8 76 ...
Страница 400: ...ELECTRICAL COMPONENTS 8 77 EAS27970 ELECTRICAL COMPONENTS ...
Страница 402: ...ELECTRICAL COMPONENTS 8 79 1 5 4 3 2 6 7 8 9 10 12 13 11 14 15 16 17 18 ...
Страница 404: ...ELECTRICAL COMPONENTS 8 81 EAS27980 CHECKING THE SWITCHES ...
Страница 431: ......
Страница 432: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...