CYLINDER HEAD
5-16
EAS24120
REMOVING THE CYLINDER HEAD
1. Remove:
• Cylinder head bolts
• Cylinder head nuts
NOTE:
• Loosen the nuts, cap nuts, and bolts in de-
creasing numerical order (refer to the numbers
in the illustration).
• Loosen each nut 1/2 of a turn at a time. After all
of the nuts are fully loosened, remove them.
EAS24160
CHECKING THE CYLINDER HEAD
1. Eliminate:
• Combustion chamber carbon deposits
(with a rounded scraper)
NOTE:
Do not use a sharp instrument to avoid damag-
ing or scratching:
• Spark plug bore threads
• Valve seats
2. Check:
• Cylinder head
Damage/scratches
→
Replace.
• Cylinder head water jacket
Mineral deposits/rust
→
Eliminate.
3. Measure:
• Cylinder head warpage
Out of specification
→
Resurface the cylinder
head.
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
a. Place a straightedge “1” and a thickness
gauge “2” across the cylinder head.
b. Measure the warpage.
c. If the limit is exceeded, resurface the cylinder
head as follows.
d. Place a 400–600 grit wet sandpaper on the
surface plate and resurface the cylinder head
using a figure-eight sanding pattern.
NOTE:
To ensure an even surface, rotate the cylinder
head several times.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
EAS24240
INSTALLING THE CYLINDER HEAD
1. Install:
• Cylinder head
NOTE:
Pass the timing chain through the timing chain
cavity.
2. Tighten:
• Cylinder head nuts “1”–“7”, “10”
• Cylinder head cap nuts “8”, “9”
8
6
2
4
10
9
3
1
5
7
12
11
Warpage limit
0.05 mm (0.0020 in)
T
R
.
.
Cylinder head nut (1st)
25 Nm (2.5 m·kg, 18 ft·lb)
Cylinder head nut (final)
42 Nm (4.2 m·kg, 30 ft·lb)
Содержание YZFR6V
Страница 1: ...SERVICE MANUAL YZFR6V C LIT 11616 19 78 2C0 28197 10 ...
Страница 57: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 EAS20410 LUBRICATION DIAGRAMS 1 2 3 4 ...
Страница 59: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 1 2 3 4 8 7 6 5 ...
Страница 61: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 1 2 3 4 5 ...
Страница 62: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 36 1 Oil cooler 2 Oil filter 3 Oil pipe 4 Oil pump 5 Oil strainer ...
Страница 63: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 1 5 4 3 2 ...
Страница 65: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 3 1 2 5 4 ...
Страница 67: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 41 1 3 2 ...
Страница 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 42 1 Oil pipe 2 Main axle 3 Drive axle ...
Страница 69: ...COOLING SYSTEM DIAGRAMS 2 43 EAS20420 COOLING SYSTEM DIAGRAMS 1 2 3 4 ...
Страница 70: ...COOLING SYSTEM DIAGRAMS 2 44 1 Radiator inlet hose 2 Radiator inlet pipe 3 Thermostat outlet hose 4 Radiator ...
Страница 71: ...COOLING SYSTEM DIAGRAMS 2 45 A A 2 1 3 4 5 6 7 8 6 13 8 9 15 14 9 10 11 12 ...
Страница 81: ...CABLE ROUTING 2 55 A 3 1 2 3 C B ...
Страница 83: ...CABLE ROUTING 2 57 4 5 7 8 9 11 13 14 12 10 15 16 11 16 6 A C E B D 5 6 10 12 16 1 2 3 ...
Страница 200: ...CHAIN DRIVE 4 73 1 2 3 a a New ...
Страница 228: ...VALVES AND VALVE SPRINGS 5 25 Each valve lifter and valve pad must be rein stalled in its original position ...
Страница 235: ...PICKUP ROTOR 5 32 ...
Страница 309: ...AIR INDUCTION SYSTEM 7 15 EAS27040 AIR INDUCTION SYSTEM 2 1 2 4 3 4 3 6 4 5 A A ...
Страница 328: ...CHARGING SYSTEM 8 14 1 AC magneto 2 Rectifier regulator 6 Main fuse 7 Battery 11 Engine ground ...
Страница 386: ...ELECTRICAL COMPONENTS 8 77 EAS27970 ELECTRICAL COMPONENTS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ...
Страница 388: ...ELECTRICAL COMPONENTS 8 79 1 5 4 3 2 6 7 8 9 10 12 13 11 14 15 16 17 ...
Страница 419: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...