Perio
d
ic maintenance an
d
a
d
justment
8-9
8
TIP
Install the bolts loosely, then install the
quick fasteners and quick fastener
screw, and then tighten the bolts.
4. Install the panel.
Cowlin
g
B
To remove the cowling
1. Remove panel A and cowling A.
2. Remove cowling B by removing
the bolts.
To install the cowling
1. Place cowling B in its original po-
sition, and then install the bolts.
2. Install cowling A and panel A.
Cowlin
g
C
To remove the cowling
1. Remove panel B. (See page 8-11.)
2. Remove the bolts, quick fastener,
and quick fastener screw.
3. Slide the cowling as shown.
1. Cowling B
2. Bolt
1
2
2
1. Cowling C
2. Bolt
3. Quick fastener screw
1. Bolt
1. Quick fastener
1
2
2
3
1
1
UBN611E0.book Page 9 Wednesday, August 30, 2017 2:47 PM