PERIODIC MAINTENANCE
3-10
4. Install:
• Vacuum gauge “1”
• Digital tachometer
(Use goods on the market)
5. Install:
• Air filter case
Refer to “AIR FILTER CASE” on page 7-
5.
• Fuel tank
Refer to “FUEL TANK” on page 7-1.
6. Check:
• Throttle body synchronization
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a. Start the engine, warm it up for several
minutes, and then let it run at the specified
engine idling speed.
b. Check the vacuum pressure.
If out of specification
→
Adjust the throttle
body synchronization.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
Adjusting the throttle body synchronization
1. Adjust:
• Throttle body synchronization
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a. Start the engine, warm it up for several
minutes, and then let it run at the specified
engine idling speed.
b. There is a white paint mark on one of the
throttle body’s bypass air screw “1”.
Use the throttle body as the base to syn-
chronize the other throttle bodies by turning
their bypass air screw in or out.
ECA14B1039
Do not turns the bypass air screw at the
throttle body which is the base for synchro-
nizing; otherwise, the engine may run
roughly at idle and the throttle bodies may
not operate properly.
TIP
• After each step, rev the engine two or three
times, each time for less than a second, and
check the synchronization again.
• If a bypass air screw was removed, turn in
the screw fully and be sure to synchronize
the throttle bodies.
• If the throttle body synchronization can not
adjusted by the bypass air screw, clean or
replace the throttle bodies.
• The difference in vacuum pressure between
the throttle bodies should not exceed 1.33
kPa (10 mmHg).
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
2. Stop the engine and remove the measuring
equipment.
Vacuum gauge
90890-03094
Carburetor synchronizer
YU-44456
Engine idling speed
1150–1250 r/min
The difference in vacuum pres-
sure between the throttle bod-
ies should not exceed 1.33 kPa
(10 mmHg).
Engine idling speed
1150–1250 r/min
Содержание YZF-R1 2012
Страница 1: ...SERVICE MANUAL YZF R1 B 2012 1KB 28197 E0 ...
Страница 6: ......
Страница 8: ......
Страница 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 EAS20410 LUBRICATION DIAGRAMS ...
Страница 72: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 ...
Страница 74: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 ...
Страница 76: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 ...
Страница 77: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 36 1 Main axle 2 Oil water pump assembly ...
Страница 78: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 ...
Страница 79: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 38 1 Main axle 2 Oil delivery pipe 2 3 Drive axle ...
Страница 80: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 ...
Страница 82: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 41 ...
Страница 84: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 43 ...
Страница 85: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 44 1 Balancer shaft 2 Crankshaft ...
Страница 86: ...COOLING SYSTEM DIAGRAMS 2 45 EAS20420 COOLING SYSTEM DIAGRAMS ...
Страница 87: ...COOLING SYSTEM DIAGRAMS 2 46 1 Oil water pump assembly 2 Radiator 3 Radiator fan 4 Thermostat 5 Oil cooler ...
Страница 88: ...COOLING SYSTEM DIAGRAMS 2 47 ...
Страница 89: ...COOLING SYSTEM DIAGRAMS 2 48 1 Radiator cap 2 Radiator 3 Radiator fan 4 Oil cooler ...
Страница 90: ...CABLE ROUTING 2 49 EAS20430 CABLE ROUTING ...
Страница 92: ...CABLE ROUTING 2 51 ...
Страница 94: ...CABLE ROUTING 2 53 ...
Страница 96: ...CABLE ROUTING 2 55 ...
Страница 98: ...CABLE ROUTING 2 57 ...
Страница 100: ...CABLE ROUTING 2 59 ...
Страница 102: ...CABLE ROUTING 2 61 ...
Страница 104: ...CABLE ROUTING 2 63 ...
Страница 106: ...CABLE ROUTING 2 65 ...
Страница 108: ...CABLE ROUTING 2 67 ...
Страница 110: ...CABLE ROUTING 2 69 ...
Страница 112: ...CABLE ROUTING 2 71 ...
Страница 114: ...CABLE ROUTING 2 73 ...
Страница 116: ...CABLE ROUTING 2 75 ...
Страница 119: ......
Страница 156: ...PERIODIC MAINTENANCE 3 37 ...
Страница 248: ...CHAIN DRIVE 4 89 ...
Страница 263: ...ENGINE REMOVAL 5 12 Installed depth of gasket c 3 5 mm 0 14 in ...
Страница 289: ...GENERATOR 5 38 4 Apply Sealant onto the stator coil lead grommet 1 Yamaha bond No 1215 Three Bond No 1215 90890 85505 ...
Страница 295: ...PICKUP ROTOR 5 44 Yamaha bond No 1215 Three Bond No 1215 90890 85505 ...
Страница 350: ...TRANSMISSION 5 99 ...
Страница 366: ...WATER PUMP 6 15 ...
Страница 388: ...AIR INDUCTION SYSTEM 7 21 EAS27040 AIR INDUCTION SYSTEM ...
Страница 394: ...AIR INDUCTION SYSTEM 7 27 ...
Страница 397: ......
Страница 398: ...IGNITION SYSTEM 8 1 EAS27090 IGNITION SYSTEM EAS27110 CIRCUIT DIAGRAM ...
Страница 404: ...ELECTRIC STARTING SYSTEM 8 7 EAS27160 ELECTRIC STARTING SYSTEM EAS27170 CIRCUIT DIAGRAM ...
Страница 410: ...CHARGING SYSTEM 8 13 EAS27200 CHARGING SYSTEM EAS27210 CIRCUIT DIAGRAM ...
Страница 411: ...CHARGING SYSTEM 8 14 2 AC magneto 3 Rectifier regulator 4 Joint 5 Main fuse 9 Battery 10 Engine ground 74 Engine ground ...
Страница 413: ...CHARGING SYSTEM 8 16 ...
Страница 414: ...LIGHTING SYSTEM 8 17 EAS27240 LIGHTING SYSTEM EAS27250 CIRCUIT DIAGRAM ...
Страница 418: ...SIGNALING SYSTEM 8 21 EAS27270 SIGNALING SYSTEM EAS27280 CIRCUIT DIAGRAM ...
Страница 425: ...SIGNALING SYSTEM 8 28 ...
Страница 426: ...COOLING SYSTEM 8 29 EAS27300 COOLING SYSTEM EAS27310 CIRCUIT DIAGRAM ...
Страница 429: ...COOLING SYSTEM 8 32 ...
Страница 430: ...FUEL INJECTION SYSTEM 8 33 EAS27330 FUEL INJECTION SYSTEM EAS27340 CIRCUIT DIAGRAM ...
Страница 503: ...FUEL INJECTION SYSTEM 8 106 ...
Страница 504: ...FUEL PUMP SYSTEM 8 107 EAS27550 FUEL PUMP SYSTEM EAS27560 CIRCUIT DIAGRAM ...
Страница 508: ...IMMOBILIZER SYSTEM 8 111 EAS27640 IMMOBILIZER SYSTEM EAS27650 CIRCUIT DIAGRAM ...
Страница 517: ...IMMOBILIZER SYSTEM 8 120 ...
Страница 518: ...ELECTRICAL COMPONENTS 8 121 EAS27972 ELECTRICAL COMPONENTS ...
Страница 520: ...ELECTRICAL COMPONENTS 8 123 ...
Страница 522: ...ELECTRICAL COMPONENTS 8 125 EAS27980 CHECKING THE SWITCHES ...
Страница 546: ...ELECTRICAL COMPONENTS 8 149 ...
Страница 553: ......
Страница 554: ......