2-35
CABLE ROUTING
SPEC
I Insert the headlight relay to the
rib of the headlight body. (No
special roder is specified for right
and left.)
J Route the headlight lead behind
the cap of headlight breather
hole. (It can be routed below, but
should not be in front of the cap.)
K To the auxiliary light lead.
L To meter assembly
M To headlight relay
E Secure the junction of headlight
lead (including the headlight
leads and position lamp leads) at
the place of white tape with the
clamp behind the pawl of head-
light body.
F To turn signal light.
G To main harness.
H Route the junction of the head-
light, position lamp and turn sig-
nal light leads through the pawl
on the headlight body. (Pay
attention to the direction.)
1 Headlight drain plug
A Make sure to securely insert the
coupler and boot.
B The headlight lead can be routed
by either of the headlight or the
boss. Do not catch the headlight
lead when assembling the front
cowling.
C Do not make the lead stretch too
much.
D Secure the junction of the cord
headlight at the place of white
tape.
EAS00035
CABLE ROUTING
26
Содержание YZF-R1 2002
Страница 1: ...Yamaha Motor Co Ltd 2002 YZF R1 P 5PW1 SE1 SERVICE INFORMATION ...
Страница 26: ...2 20 TIGHTENING TORQUES SPEC Crankcase tightening sequence 21 ...
Страница 44: ...YZF R1 2002 WIRING DIAGRAM for EUR ...
Страница 46: ...YZF R1 P 2002 WIRING DIAGRAM for AUS ...
Страница 47: ......