CABLE ROUTING DIAGRAM
2-24
1. Master cylinder
2. Brake hose holder
3. Brake hose
A. Pass the brake hose into the brake hose
holders.
B. If the brake hose contacts the rear shock
absorber spring, correct its twist.
C. Install the brake hose so that its pipe portion
directs as shown and lightly touches the pro-
jection on the master cylinder.
Содержание YZ250X 2022
Страница 5: ...EAM20162 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY...
Страница 8: ......
Страница 10: ......
Страница 38: ...MOTORCYCLE CARE AND STORAGE 1 26...
Страница 54: ...CABLE ROUTING DIAGRAM 2 15 EAM20152 CABLE ROUTING DIAGRAM Frame and engine left side view...
Страница 56: ...CABLE ROUTING DIAGRAM 2 17 Frame and engine left side view...
Страница 58: ...CABLE ROUTING DIAGRAM 2 19 Frame and engine right side view...
Страница 60: ...CABLE ROUTING DIAGRAM 2 21 Handlebar front view 0 in 0 mm 0 mm 0 in...
Страница 62: ...CABLE ROUTING DIAGRAM 2 23 Rear brake right side view...
Страница 64: ...CABLE ROUTING DIAGRAM 2 25...
Страница 92: ...ELECTRICAL SYSTEM 3 26...
Страница 160: ...CHAIN DRIVE 4 66...
Страница 180: ...CDI MAGNETO 5 18...
Страница 194: ...CLUTCH 5 32 2 1...
Страница 208: ...TRANSMISSION 5 46...
Страница 235: ...ELECTRICAL COMPONENTS 8 6 EAM30289 CHECKING THE SWITCHES 1 1 Engine stop switch...
Страница 256: ...TROUBLESHOOTING 9 13...
Страница 274: ...CHASSIS 10 17...
Страница 276: ......