ELECTRICAL COMPONENTS
8-56
Check each switch for continuity with the pocket tester. If the continuity reading is incorrect, check
the wiring connections and if necessary, replace the switch.
ECA
NOTICE
Never insert the tester probes into the coupler terminal slots “1”. Always insert the probes
from the opposite end of the coupler, taking care not to loosen or damage the leads.
TIP
• Before checking for continuity, set the pocket tester range to “
1” to make a “0” adjustment.
• When checking for continuity, switch back and forth between the switch positions a few times.
Terminal connections of the switch are shown in the terminal connection diagram below.
The switch positions “a” are shown in the far left column and the switch lead colors are shown in the
top row in the switch illustration.
TIP
“
” indicates continuity between switch terminals (i.e., a closed circuit at each switch posi-
tion).
The example illustration below shows that:
There is continuity between red and brown when the switch is “ON”.
Pocket tester
90890-03112
Analog pocket tester
YU-03112-C
a
Содержание YZ 2015 Series
Страница 6: ...EASB291006 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY...
Страница 10: ......
Страница 33: ...CONTROL FUNCTIONS 1 21 a 2...
Страница 65: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 22 EASB291066...
Страница 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25...
Страница 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27...
Страница 71: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 28 1 Exhaust camshaft 2 Intake camshaft 3 Oil filter element 4 Oil pump...
Страница 72: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29...
Страница 73: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 30 1 Camshaft 2 Oil pressure check bolt 3 Oil filter element 4 Oil pump...
Страница 74: ...CABLE ROUTING DIAGRAM 2 31 EASB291068 CABLE ROUTING DIAGRAM...
Страница 76: ...CABLE ROUTING DIAGRAM 2 33...
Страница 78: ...CABLE ROUTING DIAGRAM 2 35...
Страница 80: ...CABLE ROUTING DIAGRAM 2 37...
Страница 82: ...CABLE ROUTING DIAGRAM 2 39...
Страница 84: ...CABLE ROUTING DIAGRAM 2 41...
Страница 86: ...CABLE ROUTING DIAGRAM 2 43...
Страница 88: ...CABLE ROUTING DIAGRAM 2 45...
Страница 128: ...ELECTRICAL SYSTEM 3 38...
Страница 200: ...CHAIN DRIVE 4 70...
Страница 244: ...ELECTRIC STARTER 5 41...
Страница 266: ...OIL PUMP AND BALANCER GEAR 5 63 c d 6 6 7 8 8 b...
Страница 286: ...TRANSMISSION 5 83...
Страница 306: ...CHECKING THE INTAKE AIR TEMPERATURE SENSOR 8 67 CHECKING THE FUEL INJECTOR 8 68...
Страница 319: ...CHARGING SYSTEM 8 13 4 AC magneto 5 Rectifier regulator 8 Battery 9 Frame ground 10 Starter relay 11 Main fuse...
Страница 321: ...CHARGING SYSTEM 8 15 EASB291338...
Страница 325: ...COOLING SYSTEM For JPN 8 19 EASB291341...
Страница 355: ...FUEL PUMP SYSTEM 8 49 EASB291348...
Страница 356: ...ELECTRICAL COMPONENTS 8 50 ELECTRICAL COMPONENTS EASB291349 8 9 10 1 3 2 4 5 6 7...
Страница 358: ...ELECTRICAL COMPONENTS 8 52 11 10 9 2 3 1 6 7 8 4 5...
Страница 360: ...ELECTRICAL COMPONENTS 8 54 EASB291350 CHECKING THE SWITCHES 4 1 3 2 E B S E B E B E E B B...
Страница 361: ...ELECTRICAL COMPONENTS 8 55 1 Engine stop switch 2 Neutral switch 3 Clutch switch 4 Start switch...
Страница 382: ...LIST OF SELF DIAGNOSTIC AND FAIL SAFE ACTIONS 9 7...