ENGINE REMOVAL
5-8
2. Remove:
• Rivet “1”
• Silencer cap “2”
3. Replace:
• Fiber “1”
4. Install:
• Silencer body “1”
• Bolt “2”
TIP
Apply heat-resistant sealant to the areas “a”
shown, making sure that there are no gaps in
the beads of sealant.
5. Replace:
• Fiber “1”
TIP
Stuff the fiber into the silencer body by using a
flat board “2”.
6. Install:
• Silencer cap “1”
• Rivet “2”
TIP
• Apply heat-resistant sealant to the areas “a”
shown, making sure that there are no gaps in
the beads of sealant.
• Take care not to allow the fiber out of place
when installing the silencer body “3”.
EASB291209
INSTALLING THE ENGINE
1. Install:
• Engine “1”
Install the engine from the right side.
• Pivot shaft “2”
• Engine mounting bolt (lower side) “3”
• Front engine bracket “4”
• Engine bracket bolt (front side) “5”
• Engine mounting bolt (front side) “6”
Silencer body bolt
8 Nm (0.8 m·kgf, 5.8 ft·lbf)
LOCTITE®
2
1
1
T
R
.
.
a
1
2
LT
Pivot shaft
85 Nm (8.5 m·kgf, 61 ft·lbf)
Engine mounting bolt (lower side)
53 Nm (5.3 m·kgf, 38 ft·lbf)
Engine bracket bolt (front side)
34 Nm (3.4 m·kgf, 25 ft·lbf)
Engine mounting bolt (front side)
55 Nm (5.5 m·kgf, 40 ft·lbf)
2
1
1
1
a
2
3
3
T
R
.
.
T
R
.
.
T
R
.
.
T
R
.
.
Содержание YZ 2015 Series
Страница 6: ...EASB291006 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY...
Страница 10: ......
Страница 33: ...CONTROL FUNCTIONS 1 21 a 2...
Страница 65: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 22 EASB291066...
Страница 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25...
Страница 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27...
Страница 71: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 28 1 Exhaust camshaft 2 Intake camshaft 3 Oil filter element 4 Oil pump...
Страница 72: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29...
Страница 73: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 30 1 Camshaft 2 Oil pressure check bolt 3 Oil filter element 4 Oil pump...
Страница 74: ...CABLE ROUTING DIAGRAM 2 31 EASB291068 CABLE ROUTING DIAGRAM...
Страница 76: ...CABLE ROUTING DIAGRAM 2 33...
Страница 78: ...CABLE ROUTING DIAGRAM 2 35...
Страница 80: ...CABLE ROUTING DIAGRAM 2 37...
Страница 82: ...CABLE ROUTING DIAGRAM 2 39...
Страница 84: ...CABLE ROUTING DIAGRAM 2 41...
Страница 86: ...CABLE ROUTING DIAGRAM 2 43...
Страница 88: ...CABLE ROUTING DIAGRAM 2 45...
Страница 128: ...ELECTRICAL SYSTEM 3 38...
Страница 200: ...CHAIN DRIVE 4 70...
Страница 244: ...ELECTRIC STARTER 5 41...
Страница 266: ...OIL PUMP AND BALANCER GEAR 5 63 c d 6 6 7 8 8 b...
Страница 286: ...TRANSMISSION 5 83...
Страница 306: ...CHECKING THE INTAKE AIR TEMPERATURE SENSOR 8 67 CHECKING THE FUEL INJECTOR 8 68...
Страница 319: ...CHARGING SYSTEM 8 13 4 AC magneto 5 Rectifier regulator 8 Battery 9 Frame ground 10 Starter relay 11 Main fuse...
Страница 321: ...CHARGING SYSTEM 8 15 EASB291338...
Страница 325: ...COOLING SYSTEM For JPN 8 19 EASB291341...
Страница 355: ...FUEL PUMP SYSTEM 8 49 EASB291348...
Страница 356: ...ELECTRICAL COMPONENTS 8 50 ELECTRICAL COMPONENTS EASB291349 8 9 10 1 3 2 4 5 6 7...
Страница 358: ...ELECTRICAL COMPONENTS 8 52 11 10 9 2 3 1 6 7 8 4 5...
Страница 360: ...ELECTRICAL COMPONENTS 8 54 EASB291350 CHECKING THE SWITCHES 4 1 3 2 E B S E B E B E E B B...
Страница 361: ...ELECTRICAL COMPONENTS 8 55 1 Engine stop switch 2 Neutral switch 3 Clutch switch 4 Start switch...
Страница 382: ...LIST OF SELF DIAGNOSTIC AND FAIL SAFE ACTIONS 9 7...