– 10 –
Water priming
Make sure the water is at pump casing upper level.
Add water as necessary.
1
Upper level
NOTICE
Be sure the pump is filled up with water before
starting the engine or mechanical seal damage will
occur.
TIP
9
Place the water pump on a secure, flat and level
surface as near to the water to be pumped as pos-
sible.
9
The higher the water pump is from the water sur-
face (more suction head), the longer it will take to
prime and the lesser pump output (discharge
head) will be.
1
9CB-F8199-70-E0.indd 10
2015/02/11 9:20:31
Содержание YP30G
Страница 39: ... 34 RUBBER MOUNT INSTALLATION 9CB F8199 70 E0 indd 34 2015 02 11 9 20 35 ...
Страница 40: ...PRINTED IN CHINA 2015901 1 E 9CB F8199 70 E0 9CB F8199 70 E0 indd 35 2015 02 11 9 20 35 ...
Страница 79: ... 34 INSTALLATION DU SUPPORT EN PLASTIQUE 9CB F8199 70 F0 indd 34 2015 02 11 9 19 47 ...
Страница 80: ...IMPRIMÉ EN CHINE 2015901 1 F 9CB F8199 70 F0 9CB F8199 70 F0 indd 35 2015 02 11 9 19 47 ...