
9-35
9
3. Hook the battery band.
4. Install the panel.
TIP
Make sure the positive and negative battery
leads are installed as shown.
Fully charge the battery before installing it.
EBU36415
Replacing the fuse
If an electrical problem is suspected, check the
fuse and replace it if necessary as follows.
NOTICE
ECB00641
To prevent accidental short-circuiting, turn off
the main switch when checking or replacing a
fuse.
1. Turn off all electrical systems. (See page 5-1.)
2. Remove panel A. (See page 9-9.)
1. Positive battery lead (red)
2. Negative battery lead (black)
2
1
1. Fuse
2. Spare fuse
2
1
UBW421E0.book Page 35 Monday, June 7, 2021 1:23 PM
Содержание YFZ05YYXN
Страница 52: ...8 1 8 EBU21142 RIDING YOUR ATV UBW421E0 book Page 1 Monday June 7 2021 1 23 PM ...
Страница 117: ...11 3 11 Battery Model GTX5L BS Voltage capacity 12 V 4 0 Ah UBW421E0 book Page 3 Monday June 7 2021 1 23 PM ...
Страница 120: ...B6 yoko_Blank fm Page 1 Thursday December 8 2011 2 26 PM ...
Страница 121: ...B6 yoko_Blank fm Page 1 Thursday December 8 2011 2 26 PM ...