5 - 68
ENG
CRANKCASE
3.Fit the right crankcase onto the left crank-
case. Tap lightly on the case with a soft ham-
mer.
CAUTION:
Before installing and torquing the crank-
case holding bolts, be sure to check
whether the transmission is functioning
properly by manually rotating the shift cam
in both directions.
4.Install:
●
Lead guides
1
●
Hose guide
2
●
Crankcase bolts
5.Tighten:
●
Crankcase bolts
(follow the proper tightening sequence)
È
Right crankcase
É
Left crankcase
3
Bolt: = 30 mm
4
Bolt: = 45 mm
5
Bolt: = 60 mm
6
Bolt: = 65 mm
7
Bolt: = 80 mm
NOTE:
Tighten the bolts in stages, using a crisscross
pattern.
È
É
T
R
.
.
10 Nm (1.0 m • kg, 7.2 ft • lb)
6.Apply:
●
4-stroke engine oil
(to the crank pin, bearing and oil delivery
hole)
7.Check:
●
Crankshaft and transmission operation
Unsmooth operation
→
Repair.
Содержание YFM660RN
Страница 1: ...YFM660RN YFM660RNC SERVICEMANUAL LIT 11616 14 21 5LP 28197 E0 ...
Страница 33: ...2 11 SPEC Cylinder head tightening sequence Item Standard Limit MAINTENANCE SPECIFICATIONS ...
Страница 45: ...2 23 SPEC OIL FLOW DIAGRAMS 1 Oil tank 2 Oil pipe 2 3 Oil pipe 1 OIL FLOW DIAGRAMS ...
Страница 46: ...2 24 SPEC 1 Oil delivery pipe 2 2 Oil delivery pipe 1 3 Oil filter 4 Crankshaft 5 Oil pump OIL FLOW DIAGRAMS ...
Страница 110: ...3 54 CHK ADJ CHECKING THE BATTERY Charging method using a variable voltage charger ...
Страница 111: ...3 55 CHK ADJ CHECKING THE BATTERY Charging method using a constant voltage charger ...
Страница 300: ...8 19 ELEC CHARGING SYSTEM EB804000 CHARGING SYSTEM CIRCUIT DIAGRAM 1 AC magneto 2 Rectifier regulator 4 Battery 5 Fuse ...
Страница 327: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN PRINTED IN U S A ...